Trillo Nuclear Power Plant

Trillo Nuclear Power Plant
Map
CountrySpain
Coordinates40°42′4″N 2°37′19″W / 40.70111°N 2.62194°W / 40.70111; -2.62194
StatusOperational
Commission date1988
Owner(s)Iberdrola (48%)
Operator(s)CNAT
Nuclear power station
Reactor typePWR
Power generation
Units operational1 × 1003 MW
Nameplate capacity
  • 1,003 MW
External links
Websitewww.cntrillo.es/trillo/trillo.htm
CommonsRelated media on Commons

Trillo Nuclear Power Plant is a nuclear power station in Spain.

It was designed by Siemens for a cost of 280,000 million pesetas.[1] It consists of one pressurized water reactor (PWR) of 1066 MWe. Construction of unit one began in 1979, after Unión Eléctrica (now Unión Fenosa) was permitted to build the plant.[2] The first criticality was on 14 May 1988.

A planned second identical unit was cancelled soon after construction began following a change of government in 1983.[citation needed]

It is mainly owned by Iberdrola (49%) and Naturgy (34.5%).[3]

See also

[edit]

References

[edit]
  1. ^ "El proyecto". www.cna.es. Retrieved 24 August 2024.
  2. ^ "Resolución de la Dirección General de la Energía por la que se autoriza a «Unión Eléctrica, S. A.», la construcción de la primera unidad electronuclear de la central nuclear de Trillo (Trillo I), en la provincia de Guadalajara". www.boe.es. Retrieved 24 August 2024.
  3. ^ "Centrales Nucleares en España". Ministerio para la Transición Ecológica y el Reto Demográfico (in Spanish). Retrieved 24 August 2024.
[edit]