Wenjing Road station
General information | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Location | Dongchuan Road and Wenjing Road (文井路) Minhang District, Shanghai China | ||||||||||
Coordinates | 31°00′19″N 121°22′34″E / 31.0053°N 121.3760°E | ||||||||||
Operated by | Shanghai No.1 Metro Operation Co. Ltd. | ||||||||||
Line(s) | Line 5 | ||||||||||
Platforms | 2 (2 side platforms) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | 25 November 2003 | ||||||||||
Closed | 2027 (estimated) | ||||||||||
Services | |||||||||||
| |||||||||||
|
Wenjing Road (Chinese: 文井路; pinyin: Wénjǐng Lù) is a station on Line 5 of the Shanghai Metro.[1] It is situated on the branch service of the line, between Dongchuan Road and Minhang Development Zone. Passengers can transfer to the main line at Dongchuan Road. However, since 26 December 2020, this is not the case, as trains have resumed service all the way to Xinzhuang.
References
[edit]- ^ "Wenjing Road". Explore Shanghai. Retrieved 2020-09-07.