Zhangjiang Road station
General information | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Location | Zhongke Road and Zhangjiang Road, Pudong, Shanghai China | ||||||||||
Coordinates | 31°11′29″N 121°37′33″E / 31.1914°N 121.6258°E | ||||||||||
Operated by | Shanghai No. 2 Metro Operation Co. Ltd. | ||||||||||
Line(s) | Line 13 | ||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | 30 December 2018 | ||||||||||
Services | |||||||||||
|
Zhangjiang Road (simplified Chinese: 张江路; traditional Chinese: 張江路; pinyin: Zhāngjiāng Lù) is the current eastern terminus station on Line 13 of the Shanghai Metro,[1] and is the current eastern terminus of the line. Located at Zhongke Road and Zhangjiang Road in Pudong, Shanghai, the station opened with the phases 2 and 3 extensions of Line 13 on 30 December 2018.[2][3]
References
[edit]- ^ 上海轨道交通13号线二期、三期工程导向标识设计咨询项目招标公告. Okcis.cn (in Chinese (China)). Retrieved 2018-04-01.
- ^ Shanghai Shentong Metro Group Co., Ltd. (2018-12-28). 5号线南延伸和13号线二、三期12月30日起试运营. Shanghai Shentong Metro Group Co., Ltd. (in Chinese). Retrieved 2018-12-29.
- ^ 上海13号线二期三期单线贯通 江桥直通张江交通效率提升. Leju.com (in Chinese (China)). 2018-01-09. Retrieved 2018-04-01.