Clementi MRT station - Simple English Wikipedia, the free encyclopedia

 EW23  CR17 
Clementi
金文泰
கிளிமெண்டி
Clementi
Mass Rapid Transit (MRT) station
Exterior of the station
General information
Location3150 Commonwealth Avenue West
Singapore 129580
Coordinates1°18′55.09″N 103°45′54.88″E / 1.3153028°N 103.7652444°E / 1.3153028; 103.7652444
Operated bySMRT Trains (SMRT Corporation)
Line(s)
Platforms2 (1 island platform)
Tracks2
ConnectionsClementi Bus Interchange, Taxi
Construction
Structure typeElevated (EWL)
Underground (CRL)
Platform levels1
ParkingYes (Clementi Mall)
Disabled accessYes
History
Opened12 March 1988; 36 years ago (1988-03-12) (East West line)
Opening2032; 8 years' time (2032) (Cross Island line)
ElectrifiedYes
Services
Preceding station Mass Rapid Transit Following station
Jurong East
towards Tuas Link
East–West Line Dover
towards Pasir Ris
Maju Cross Island Line
Future service
West Coast
Location
Singapore MRT/LRT system map
Singapore MRT/LRT system map
Clementi
Clementi station in Singapore

Clementi MRT Station (EW23) is an above-ground Mass Rapid Transit (MRT) station in Singapore. It is part of the East West MRT Line. Part of the East West Line, Clementi MRT Station is heavily used by commuters who live in Clementi itself or further west to go to work and also, by students of the National University of Singapore, Ngee Ann Polytechnic and other schools around Clementi. Hence, the station experiences high passenger traffic throughout the day due to it serving a wide range of passengers.

The tracks between this station and Jurong East is the second longest between any two stations on the East West Line, the longest being the tracks between Expo and Changi Airport MRT Stations. It takes four minutes for trains to travel between these two stations.

The station is also directly linked to the Clementi Mall and Clementi Bus Interchange. Together, they form the Clementi Integrated Transport Hub (ITH).

It was opened on 12 March 1988.


On 5 August 1993, at around 7.53 am, two trains collided in the station. It appeared that one train had stopped at the station for longer than usual after experiencing a technical fault, and then a second westward train hit the first. It was caused by a 50 litre oil spill. 156 commuters were injured, many of whom were on their way to work. Eight were admitted to three hospitals, while the rest received outpatient treatment. In the aftermath of the accident, SMRT said that it would replace the faulty maintenance locomotives and purchase new ones. It also introduced a new policy for station managers to inspect tracks for oil or foreign objects before the start of service.

Together with Commonwealth and Queenstown stations, this station will see the construction of an additional pedestrian link bridge linking the station to two new exits, one on each side of the road. The exits will be equipped with fare gates and ticketing machines. It was completed and opened on 25 August 2015.[1]

References

[change | change source]
  1. "Enhancing Connectivity and Comfort for Commuters". LTA. 2011-10-13. Archived from the original on 2012-07-10.

Other websites

[change | change source]