ADNOC Headquarters
ADNOC Headquarters | |
---|---|
General information | |
Status | Completed |
Type | Commercial - Multi-Storey Project |
Town or city | Abu Dhabi |
Country | United Arab Emirates |
Current tenants | Abu Dhabi National Oil Company (ADNOC) |
Construction started | 2009 |
Completed | 2014 |
Cost | $316.45 million (estimated) |
Owner | Adnoc (UAE Government) |
Height | 342 m (1,122 ft) |
Technical details | |
Floor count | 76 |
Floor area | 190,000 square meters |
Design and construction | |
Main contractor | Six Construct Co |
ADNOC Headquarters is a skyscraper office complex located in Abu Dhabi, United Arab Emirates and is the corporate headquarters of the Abu Dhabi National Oil Company (ADNOC).[1]
The building incorporates energy efficiency and sustainable engineering technologies, such as a double skin façade, LED exterior lighting. Designed by HOK, the overall building complex consists of more than 65 floors with an office tower, corniche club, SPC and Crisis Management Centre, a heritage museum and other supporting facilities.[2]
Gallery
[edit]- Skyline of Abu Dhabi with ADNOC Headquarters at right
- ADNOC Headquarters at dawn
See also
[edit]References
[edit]- ^ "ADNOC Headquarters". The Skyscraper Center. Council on Tall Buildings and Urban Habitat. Retrieved 2013-03-31.
- ^ "Double Facade Study - Thesis" (PDF). Retrieved 2015-11-03.