Dubai Towers Doha

Dubai Towers Doha
أبراج دبي الدوحة
Rendering of the building
Dubai Towers Doha is located in Doha
Dubai Towers Doha
Location within Doha
General information
StatusOn hold
TypeHotel, office, residential, restaurant, retail
Architectural styleFuturism, glass
LocationCorniche Street, West Bay, Doha, Qatar
Coordinates25°18′52″N 51°31′20″E / 25.31444°N 51.52222°E / 25.31444; 51.52222
Construction startedJune 18, 2007
Construction stoppedNovember 12, 2010
Cost2.3 Billion Qatari riyal 620 million USD[citation needed]
Height
Antenna spire437.2 m (1,434 ft) [1]
Roof403 m (1,322 ft)
Technical details
Floor count91
Design and construction
Architect(s)RMJM Architect of Record  : Diwan Al Emara
DeveloperSama Dubai
(Dubai International Properties)
Main contractorAl Habtoor-Al Jaber Joint Venture

Dubai Towers - Doha is a stalled supertall skyscraper with a roof height of 403 m (1,322 ft) (spire height 432 m (1,417 ft)) developing in Doha, Qatar. The estimated cost of Dubai Towers - Doha is 2.3 billion Qatari Riyal (US$620 million).[2] When completed, the structure would have been the tallest building in Qatar.

Located in the West Bay district of Doha, next to the Doha Corniche, the 90-story multi-use tower was being developed by Sama Dubai, which was plagued with legal troubles, and was formerly known as Dubai International Properties, the international real estate investment and development arm of Dubai Holding.

The project was contracted to a joint venture between Al-Habtoor and Al Jaber,[3] while Robert Matthew Johnson Marshall (RMJM) are the architects and engineering consultants. The cost consultants are Hanscomb Consultants Inc. The Project Management consultant is Sama ECH.

When completed the mixed use tower was to include a 7,000 m2 (75,000 sq ft) retail area, 13 floors comprising a 225-room five-star hotel, 29 floors of office space and 31 floors containing 226 luxury apartments and three super luxury penthouses.

The project was severely delayed as a result of the financial crash in Dubai and legal troubles at Sama Dubai. Investors in the property had been advised that the building was 9 months behind schedule. By May 2010 only 29 of the proposed 84 stories had been built. At that building rate, this would suggest at least another 11-year delay until completion.

Dubai towers under construction (October 2011)

In February 2022, a few floors had been cladded in dirty glass.

As of June 2024, the building still stands in its partially constructed state and is visible in the Doha skyline.

References

[edit]
  1. ^ a b "Building Profile". Emporis. Archived from the original on February 15, 2013.{{cite web}}: CS1 maint: unfit URL (link)
  2. ^ "Dubai Towers Doha". FamousFix.com. Retrieved 2024-10-24.
  3. ^ a b "Contractors". Search dot com. Archived from the original on 2014-10-23. Retrieved 2010-01-02.
  4. ^ "Year of Completion". World Arab. Archived from the original on 2009-11-19.
[edit]