Jurong West MRT station
JS6 Jurong West 裕廊西 ஜூரோங் வெஸ்ட் | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Future Mass Rapid Transit (MRT) station | |||||||||||
General information | |||||||||||
Coordinates | 1°20′57″N 103°42′30″E / 1.34919°N 103.70831°E | ||||||||||
Owned by | Land Transport Authority | ||||||||||
Line(s) | |||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Platform levels | 1 | ||||||||||
Bicycle facilities | Yes | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opening | 2027 | ||||||||||
Electrified | Yes | ||||||||||
Services | |||||||||||
| |||||||||||
|
Jurong West MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region Line in Jurong West, Singapore.[1][2][3]
History
[edit]On 9 May 2018, LTA announced that Jurong West station would be part of the proposed Jurong Region line (JRL). The station will be constructed as part of Phase 1, JRL (West), consisting of 10 stations between Choa Chu Kang, Boon Lay and Tawas, and is expected to be completed in 2027.[4]
On 20 November 2019, Contract J105 for the design and construction of Jurong West Station and associated viaducts was awarded to China Railway 11 Bureau Group (Singapore Branch) at a sum of S$210.1 million. Construction starts in 2020, with completion in 2027.[5][6] Contract J105 also includes the design and construction of Bahar Junction Station, and associated viaducts.[7][8]
Initially expected to open in 2026, the restrictions on the construction due to the COVID-19 pandemic has led to delays in the JRL line completion, and the date was pushed to 2027.[9]
Location
[edit]The station will be straddled over the existing Jurong West Avenue 2, just west of the junction with Jurong West Street 23, and east of the junction with Jurong West Avenue 4, Jalan Bahar and Jalan Boon Lay. It is located within the Jurong West planning area between the Boon Lay Place and Wenya Subzones,[10] with a St. Joseph's Home and Singapore Boy's Home to the north, and a housing estate to the south.
Access to the station will be via 3 exits on each side of Jurong West Avenue 2.[11]
References
[edit]- ^ "Jurong Region Line to serve NTU, Tengah estate, Jurong Industrial Estate - CNA". 21 September 2019. Archived from the original on 21 September 2019. Retrieved 21 September 2019.
- ^ "Residents and students welcome Jurong Region Line but find it confusing". 21 September 2019. Archived from the original on 21 September 2019. Retrieved 21 September 2019.
- ^ "Jurong Region Line". 21 September 2019. Archived from the original on 21 September 2019. Retrieved 21 September 2019.
- ^ "Joint News Release by the Land Transport Authority (LTA) & SLA - Jurong Region Line: Enhancing Connectivity in the West | Press Room | Land Transport Authority". 21 September 2019. Archived from the original on 21 September 2019. Retrieved 21 September 2019.
- ^ "LTA | News Room | 1 | LTA Awards Civil Contract to Construct Two Stations for the Jurong Region Line". 9 December 2019. Archived from the original on 9 December 2019. Retrieved 9 December 2019.
- ^ "Annex A Details of Contract J105 Stations" (PDF). 9 December 2019. Archived from the original (PDF) on 9 December 2019. Retrieved 9 December 2019.
- ^ "Tender information | Land Transport Authority". 21 September 2019. Archived from the original on 21 September 2019. Retrieved 21 September 2019.
- ^ "Construction of Jurong West, Bahar Junction stations on Jurong Region Line to start in 2020, end in 2026, Singapore News & Top Stories - The Straits Times". 9 December 2019. Archived from the original on 9 December 2019. Retrieved 9 December 2019.
- ^ "Written Reply by Minister for Transport Ong Ye Kung to Parliamentary Question on Prioritising Early Completion of Jurong Region MRT Line". www.mot.gov.sg. 1 February 2021. Archived from the original on 19 February 2021. Retrieved 24 March 2021.
- ^ "Singapore's Jurong West Planning Area". Key Location. Archived from the original on 21 September 2019. Retrieved 21 September 2019.
- ^ "Jurong Region Line". 21 September 2019. Archived from the original on 21 September 2019. Retrieved 21 September 2019.