List of high-speed railway lines
This article provides a list of operational and under construction (or approved) high-speed rail networks, listed by country or region. While the International Union of Railways defines high-speed rail as public transport by rail at speeds of at least 200 km/h (124 mph) for upgraded tracks and 250 km/h (155 mph) or faster for new tracks, this article lists all the systems and lines that support speeds over 200 km/h (120 mph) regardless of their statuses of upgraded or newly built.[1][2]
Overview
[edit]Operational networks
[edit]The following table is an overview of high-speed rail in service and under construction by country, ranked by the amount in service. It shows all the high speed lines (speed of 200 km/h (125 mph) or over) in service. The list is based on UIC figures (International Union of Railways),[3][4] updated with other sources.[5]
Country or region | Continent | Operational length (km) | Under construction (km) | Total length (km) | Density (m/km2) | Length (km) per 100,000 people[a] | Top speed (km/h) | Electrification | Track gauge (mm) | Opened |
---|---|---|---|---|---|---|---|---|---|---|
![]() | Asia | 45,000[6] | 25,000 | 70,000[7] | 4.7 | 3.16 | 350[8][b] | 25 kV 50 Hz AC | 1435 | 2008 |
![]() | Europe | 3,973[11] | 1,034 | 5,000 | 7.84 | 8.42 | 310 | 3 kV DC, 25 kV 50 Hz AC | 1435; 1668 | 1992 |
![]() | Europe | 3,516.346 | 372 | 3,888.346 | 5.77 | 5.73 | 320[12] | 25 kV 50 Hz AC | 1435 | 1981 |
![]() | Europe | 3,316.74 | 762 | 4,078.74 | 9.29 | 3.98 | 300 | 15 kV 16.7 Hz AC | 1435 | 1991 |
![]() | Asia | 3,067[13] | 497.6 | 3,564.6 | 9.07 | 2.5 | 320[c] | 25 kV 50/60 Hz AC | 1435[d] | 1964 |
![]() | Europe | 1,700 | 506[e] | 2,206 | 3.78 | 16.02 | 205[f] | 15 kV 16.7 Hz AC | 1435 | 1993 |
![]() | Asia | 1,548.7 | 944.2 | 2,492.9 | 15.43 | 2.99 | 320 | 25 kV 60 Hz AC | 1435 | 2004 |
![]() | Europe | 1,485.3 | 230 | 1,715.3[14] | 6.11 | 2.19 | 300[g] | 25 kV 50 Hz AC[h] | 1435 | 1976 |
![]() | Europe | 1,312.464 | 1,181.068 | 2,493.532 | 4.36 | 2.23 | 300 | 25 kV 50 Hz AC, 3 kV DC | 1435 | 1977 |
![]() | Europe/Asia | 1,021[i] | 1,737[j] | 2,758 | 1.3 | 1.27 | 300 | 25 kV 50 Hz AC | 1435 | 2009 |
![]() | Europe | 987.1 | 95 | 1,082.1 | 2.92 | 17.8 | 220 | 25 kV 50 Hz AC | 1524[k] | 2006 |
![]() | Europe | 672[l] | 30 | 702 | 5.09 | 6.5 | 200 | 25 kV 50 Hz AC | 1435 | 2022 |
![]() | Europe | 650[15] | 680[16] | 1,330 | 0.04 | 0.42 | 250 | 3 kV DC, 25 kV 50 Hz AC | 1520 | 1984 |
![]() | Asia | 600[m] | 465[17] | 1,065 | 1.34 | 1.71 | 250 | 20 kV 50 Hz AC | 1520 | 2011 |
![]() | Asia | 450[18] | 0 | 450 | 0.21 | 1.22 | 300 | 25 kV 50 Hz AC | 1435 | 2018 |
![]() | Asia | 350[19] | 0 | 350 | 9.67 | 1.46 | 300 | 25 kV 60 Hz AC | 1435 | 2007 |
![]() | Europe | 326[n] | 3[o] | 329 | 8.25 | 2.79 | 300 | 3 kV DC, 25 kV 50 Hz AC | 1435 | 1997 |
![]() | Europe | 285.047[p] | 257 | 542.047 | 0.91 | 0.75 | 200 | 3 kV DC | 1435 | 2014 |
![]() | Europe | 283[q] | 357.3 | 640.3 | 3.37 | 3.16 | 230 | 15 kV 16.7 Hz AC | 1435 | 1990 |
![]() | Europe | 224[r] | 90[20][s] | 314 | 2.67 | 2.19 | 220 | 25 kV 50 Hz AC | 1668 | 1999 |
![]() | Africa | 186[22] | 375 | 561 | 0.26 | 0.49 | 320 | 25 kV 50 Hz AC | 1435 | 2018 |
![]() | Europe | 175[t] | 0 | 175 | 4.18 | 1.95 | 300[u] | 1.5 kV DC, 25 kV 50 Hz AC | 1435 | 2009 |
![]() | Europe | 173[v] | 208.6 | 381.6 | 0.54 | 3.16 | 210 | 15 kV 16.7 Hz AC | 1435 | 1998 |
![]() | Europe | 164[w] | 232.5 | 396.5 | 3.97 | 1.86 | 230 | 15 kV 16.7 Hz AC | 1435 | 2005 |
![]() | Asia | 143[23] | 0 | 143 | 0.08 | 0.05 | 350 | 27.5 kV 50 Hz AC | 1435 | 2023 |
![]() | North America | 136.6[24] | 1,249 | 1,385.6 | 0.01 | 0.04 | 240 | Multiple[x] | 1435 | 2000 |
![]() | Europe | 70[25] | 238[26][27] | 308 | 0.79 | 0.98 | 200 | 25 kV 50 Hz AC | 1435 | 2022 |
![]() | Europe | 60[28] | 100[29] | 160 | 0.68 | 0.98 | 200 | 25 kV 50 Hz AC | 1435 | 2019 |
![]() | Asia | 26[30] | 0 | 26 | 23.51 | 0.35 | 200 | 1.5 kV DC, 25 kV 50 Hz AC | 1435 | 2018 |
By region
[edit]Region | Continent | Operational length (km) | Under construction (km) | Total length (km) | Density (m/km2) | Length per 100,000 people (km)[a] | Top speed (km/h) | Electrification | Common track gauge (mm) | Year opened |
---|---|---|---|---|---|---|---|---|---|---|
Asia | 52,205.7 | 30,993.99 | 83,199.69 | 1.17 | 1.11 | 350 | 25 kV 50 or 60 Hz AC | 1435[y] | 1964 | |
Europe[z] | 19,082.4 | 7,071 | 26,153.4 | 1.81 | 2.56 | 320 | Various[aa] | 1435[ab] | 1976 | |
![]() | Europe | 16,745.36 | 5,379.5 | 22,124.87 | 3.96 | 3.73 | 320 | Various[aa] | 1435[ac] | 1977 |
Africa | 186 | 737 | 923 | 0.01 | 0.01 | 320 | 25 kV 50 Hz AC | 1435 | 2018 | |
North America | 136.6 | 1,249 | 1,329 | 0.006 | 0.02 | 240 | Multiple[ad] | 1435 | 2000 | |
World | 71,600.76 | 40,111.48 | 111,712.37 | 0.481 | 0.87 | 350 | Various | 1435 | 1964 |
Freight services
[edit]Country | Continent | Service | Type | Top speed (km/h) | Introduced | Status |
---|---|---|---|---|---|---|
![]() | Asia | JR freight service | Light freight | 320 | 2019[31] | Operational |
![]() | Europe | IC:Kurier | Courrier | 300 | 2020[32] | Operational |
![]() | Asia | Freight Express | Dedicated freight train | 350 | 2020[33] | Operational on busy routes |
![]() | Europe | SNCF TGV La Poste | Dedicated freight train | 270 | 1984 | Defunct in 2015[34] |
![]() | Europe | Mercitalia Fast | Dedicated freight train | 300 | 2018 | Defunct in 2022 |
Networks under construction
[edit]Country/Region | Continent | Length (km) | Length approved (km) | Total (km) | Density (m/km2) | Length per 100,000 people (km)[a] | Top speed (km/h) | Electrification | Track gauge (mm) | Work began | Opening |
---|---|---|---|---|---|---|---|---|---|---|---|
![]() | Asia | 926 | 0 | 926 | 0.56 | 1.04 | 200 | 25 kV 50 Hz | 1435 | 2015 | TBD |
![]() ![]() ![]() (Rail Baltica) | Europe | 870[35] | 0 | 870 | 4.97 | 14.82 | 234[36] | 25 kV 50 Hz | 1435 | 2017 | 2028 |
![]() | Asia | 826.01 | 1,828 | 2,654.01 | 1.61 | 1.15 | 250 | 25 kV 50 Hz | 1435 | 2017 | 2027 |
![]() | Asia | 508.18[37] | 0 | 508.18 | 0.15 | 0.04 | 320 | 25 kV 50 Hz | 1435 | 2021 | 2028 |
![]() | Africa | 230[38] | 1,770 | 2,000 | 0.23 | 0.2 | 250 | 25 kV 50 Hz | 1435 | 2021 | 2027 |
![]() | Asia | 150 | 0 | 150 | 1.79 | 1.36 | 350 | 25 kV 50 Hz | 1435 | 2025[39] | 2028 |
![]() | Europe | 139.9 | 667.49 | 807.39 | 1.78 | 1.29 | 200 | 25 kV 50 Hz | 1435 | 2017 | TBD |
![]() | Africa | 132[40] | 0 | 132 | 0.06 | 0.29 | 220 | 25 kV 50 Hz | 1435 | 2012 | TBD |
![]() | North America | 0 | 1,047[41][42] | 1,047 | 0.1 | 2.61 | 400 | 25 kV 50 Hz | 1435 | TBD[43] | TBD[44] |
![]() ![]() ![]() | Africa | 0 | 596 | 596 | 2.02 | 0.62[45] | 250 | 25 kV 50 Hz | 1435 | TBD | 2033 |
Asia
[edit]China
[edit]
Line | Termini | Length | Type | Maximum speed | Opening | Status |
---|---|---|---|---|---|---|
Shanghai maglev train | Longyang Road–Pudong International | 30.5 km (19.0 mi) | New | 431 km/h (268 mph) | 2004 | Operational |
Beijing–Shanghai | Beijing south–Tianjin West / Shanghai Hongqiao | 1,318 km (819 mi) | New | 350 km/h (220 mph) | 2011 | Operational |
Beijing–Guangzhou[ae] | Beijing west–Guangzhou | 2,230 km (1,390 mi) | New | 350 km/h (220 mph) | 2012 | Operational |
Hangzhou–Fuzhou–Shenzhen | Hangzhou east–Shenzhen north | 1,495 km (929 mi) | New | 350 km/h (220 mph) | 2013 | Operational |
Huhanrong PDL | Shanghai Hongqiao–Chengdu | 2,078 km (1,291 mi) | New | 350 km/h (220 mph) | 2014 | Operational |
Shanghai–Kunming | Shanghai Hongqiao–Kunming south | 2,066 km (1,284 mi) | New | 350 km/h (220 mph) | 2016 | Operational |
Guangzhou–Kunming | Guangzhou south–Kunming south | 1,285 km (798 mi) | New | 350 km/h (220 mph) | 2016 | Operational |
Suifenhe–Manzhouli | Suifenhe–Manzhouli | 714 km (444 mi) | Upgraded | 250 km/h (160 mph) | 2018 | Operational |
Qingdao–Yinchuan | Qingdao north–Yinchuan | 1,762 km (1,095 mi) | Upgraded | 350 km/h (220 mph) | 2018 | Operational |
Beijing–Lanzhou | Beijing–Lanzhou | 1,526 km (948 mi) | Upgraded | 350 km/h (220 mph) | 2019 | Operational |
Beijing–Harbin[ae] | Beijing Chaoyang–Harbin / Dalian | 1,700 km (1,100 mi) | New | 350 km/h (220 mph) | 2021 | Operational |
Eurasia Continental Bridge | Lianyungang–Ürümqi | 3,422 km (2,126 mi) | New | 350 km/h (220 mph) | 2021 | Operational |
Coastal corridor (north extension)[af] | Dandong–Ningbo | 2,659 km (1,652 mi) | New | 350 km/h (220 mph) | 2027 | Mostly operational[ag] |
Coastal corridor (south extension)[af] | Huizhou south–Dongxing | 954 km (593 mi) | New | 350 km/h (220 mph) | 2028 | Mostly operational[ah] |
Hohhot–Nanning | Hohhot–Nanning | 2,779.7 km (1,727.2 mi) | New | 350 km/h (220 mph) | 2028 | Mostly operational[ai] |
Baotou (Yinchuan)–Hainan[aj] | Baotou–Sanya / Xi'an north | 4,664 km (2,898 mi) | New | 350 km/h (220 mph) | 2028 | Mostly operational[ak] |
Lanzhou (Xining)–Guangzhou | Lanzhou west–Guangzhou | 2,282 km (1,418 mi) | New | 350 km/h (220 mph) | 2028 | Mostly operational[al] |
Beijing–Hong Kong (Taipei) | Beijing Fengtai–Hong Kong West Kawloon / Taipei[am] | 4,392 km (2,729 mi) | New | 350 km/h (220 mph) | 2029 | Mostly operational[an] |
Shanghai–Chongqing–Chengdu | Shanghai Baoshan–Chengdu | 5,130 km (3,190 mi) | New | 350 km/h (220 mph) | 2029 | Partly operational[ao] |
Beijing–Kunming[ap] | Beijing–Kunming / Chongqing | 3,795.7 km (2,358.5 mi) | New | 350 km/h (220 mph) | 2030 | Mostly operational[aq] |
Xiamen–Chongqing | Xiamen–Chongqing | 937 km (582 mi) | New | 350 km/h (220 mph) | TBD | Partly operational[ar] |
Regional railways | Multiple lines | 1,611 km (1,001 mi) | New | 350 km/h (220 mph) | 2008–2020 | Operational |
Intercity railways | Multiple lines | 7,210 km (4,480 mi) | New | 250 km/h (160 mph) | 2008–2020 | Operational |
Class I railways | Multiple lines | 5,056.9 km (3,142.2 mi) | Upgraded | 200 km/h (120 mph) | 2012–2019 | Operational |
India
[edit]Line | Termini | Length | Type | Maximum speed | Opening | Status |
---|---|---|---|---|---|---|
Mumbai–Ahmedabad | Mumbai BKC–Sabarmati | 508.18 km (315.77 mi) | New | 320 km/h (200 mph) | 2028 | Under construction |
Indonesia
[edit]Line | Termini | Length | Type | Maximum speed | Opening | Status |
---|---|---|---|---|---|---|
Whoosh high-speed railway | Halim (Jakarta)–Tegalluar (Bandung) | 142.8 km (88.7 mi) | New | 350 km/h (220 mph) | 2023 | Operational |
Japan
[edit]
Line | Termini | Length | Type | Maximum speed | Opening | Status |
---|---|---|---|---|---|---|
Tokaido Shinkansen | Tokyo–Shin-Osaka | 515.4 km (320.3 mi) | New | 285 km/h (177 mph) | 1964 | Operational |
San'yō Shinkansen | Shin-Osaka–Hakata | 553.7 km (344.1 mi) | New | 300 km/h (190 mph) | 1972–1975 | Operational |
Tōhoku Shinkansen | Tokyo–Shin-Aomori | 674.9 km (419.4 mi) | New | 320 km/h (200 mph) | 1982–2010 | Operational |
Jōetsu Shinkansen | Tokyo–Niigata | 269.5 km (167.5 mi) | New | 275 km/h (171 mph) | 1982 | Operational |
Hokuriku Shinkansen | Takasaki–Tsuruga | 470.6 km (292.4 mi) | New | 260 km/h (160 mph) | 1997–2024 | Operational |
Tsuruga–Shin-Osaka | 147 km (91 mi)[46] | New | 260 km/h (160 mph) | 2030s-2040s | Approved | |
Kyushu Shinkansen | Hakata–Kagoshima-Chūō | 256.8 km (159.6 mi) | New | 260 km/h (160 mph) | 2004–2011 | Operational |
Nishi Kyushu Shinkansen | Takeo-Onsen–Nagasaki | 66 km (41 mi) | New | 260 km/h (160 mph) | 2022 | Operational |
Hokkaido Shinkansen | Shin-Aomori–Shin-Hakodate-Hokuto | 148.8 km (92.5 mi) | New | 260 km/h (160 mph) | 2016 | Operational |
Shin-Hakodate-Hokuto-Sapporo | 212 km (132 mi) | New | 320 km/h (200 mph) | 2031+ | Under Construction | |
Chuo Shinkansen | Shinagawa (Tokyo)–Nagoya | 285.6 km (177.5 mi) | New | 505 km/h (314 mph)[as] | 2034[at] | Under construction |
Saudi Arabia
[edit]Line | Termini | Length | Type | Maximum speed | Opening | Status |
---|---|---|---|---|---|---|
Haramain HSR | Mecca–Medina | 453 km (281 mi) | New | 300 km/h (190 mph) | 2018 | Operational |
South Korea
[edit]
Line | Termini | Length | Type | Maximum speed | Opening | Status |
---|---|---|---|---|---|---|
Gyeongbu HSR | Seoul–Busan | 417.4 km (259.4 mi) | New | 305 km/h (190 mph) | 2004–2015 | Operational |
Jeolla Line | Iksan–Yeosu Expo | 180.4 km (112.1 mi) | Upgraded | 230 km/h (140 mph) | 2011 | Operational |
Honam HSR | Osong–Mokpo | 249.2 km (154.8 mi) | New | 305 km/h (190 mph) | 2015 | Operational |
Suseo–Pyeongtaek HSR | Suseo–PyeongtaekJije | 61.1 km (38.0 mi) | New | 305 km/h (190 mph) | 2016 | Operational |
PyeongtaekJije–Osong | 46.4 km (28.8 mi) | 2028 | Under construction | |||
Gyeonggang Line | Seowonju–Gangneung | 120.2 km (74.7 mi) | New | 250 km/h (160 mph) | 2017 | Operational |
Yeoju–Seowonju | 22.1 km (13.7 mi) | 2027 | Under construction | |||
Jungbunaeryuk Line | Bubal–Mungyeong | 92.7 km (57.6 mi) | New | 230 km/h (140 mph) | 2021-2024 | Operational |
Mungyeong–Gimcheon | 69.8 km (43.4 mi) | Upgraded | 250 km/h (160 mph) | 2031 | Approved | |
Jungang Line | Cheongnyangni–Moryang | 185.4 km (115.2 mi)[47] | Partly new | 250 km/h (160 mph) | 2021–2024 | Operational |
Donghae Line | Taehwagang–Samcheok | 242.3 km (150.6 mi) | Upgraded | 200 km/h (120 mph) | 2025 | Operational |
Gangneung–Jejin | 111.7 km (69.4 mi) | New | 250 km/h (160 mph) | 2027 | Under construction | |
Seohae Line | Seohwaseong–Hongseong | 90 km (56 mi) | New | 250 km/h (160 mph) | 2026 | Under construction |
Janghang Line | Hongseong–Iksan | 95.5 km (59.3 mi) | Upgraded | 250 km/h (160 mph) | 2027 | Under upgradation |
Gyeongjeon Line | Bujeon–Suncheon | 165.8 km (103.0 mi) | Upgraded | 230 km/h (140 mph) | 2025 | Under upgradation |
Imseong-ri–Boseong | 82.5 km (51.3 mi) | Upgraded | 200 km/h (120 mph) | 2025 | Under upgradation | |
Suncheon–GwangjuSongjeong | 121.5 km (75.5 mi) | Upgraded | 250 km/h (160 mph) | 2030 | Under upgradation | |
Chuncheon-Sokcho Line | Chuncheon–Sokcho | 93.7 km (58.2 mi) | New | 250 km/h (160 mph) | 2027 | Under construction |
Nambunaeryuk Line | Gimcheon–Geoje | 177.9 km (110.5 mi) | New | 250 km/h (160 mph) | 2030 | Approved |
Chungbuk Line | Osong–Bongyang | 115 km (71 mi) | Upgraded | 230 km/h (140 mph) | 2031 | Under upgradation |
Taiwan
[edit]
Line | Termini | Length | Type | Maximum speed | Opening | Status |
---|---|---|---|---|---|---|
Taiwan HSR | Nangang–Zuoying | 350 km (220 mi) | New | 300 km/h (190 mph) | 2007 | Operational |
Thailand
[edit]
Line | Termini | Length | Type | Maximum speed | Opening | Status |
---|---|---|---|---|---|---|
Northeastern HSR | Krung Thep Aphiwat Central–Nakhon Ratchasima–Nong Khai | 606.01 km (376.56 mi) | New | 250 km/h (160 mph) | 2028[48] | Under construction |
Eastern HSR | Don Mueang–U-Tapao | 220 km (140 mi) | New | 250 km/h (160 mph) | 2029 | Under construction |
U-Tapao–Trat | 190 km (120 mi) | New | 250 km/h (160 mph) | TBD | Approved | |
Northern HSR | Krung Thep–Chiang Mai | 668 km (415 mi) | New | 300 km/h (190 mph) | TBD | Approved |
Southern HSR | Krung Thep Aphiwat–Padang Besar | 970 km (600 mi) | New | 300 km/h (190 mph) | TBD | Approved |
Turkey
[edit]Line | Termini | Length | Type | Maximum speed | Opening | Status |
---|---|---|---|---|---|---|
Polatlı–Konya | Polatlı–Konya | 212 km (132 mi) | New | 250 km/h (160 mph) | 2011 | Operational |
Ankara–Istanbul | Sincan–Köseköy | 313 km (194 mi) | Partly new | 250 km/h (160 mph) | 2014 | Operational |
Other sections | 20 km (12 mi) | New | 250 km/h (160 mph) | 2028 | Under construction | |
Konya–Yenice railway | Konya–Karaman | 102 km (63 mi) | Upgraded | 200 km/h (120 mph) | 2021 | Operational |
Karaman–Ulukışla | 135 km (84 mi) | Upgraded | 200 km/h (120 mph) | 2026 | Under upgradation | |
Ankara–Sivas | Kayaş–Sivas | 394 km (245 mi) | New | 250 km/h (160 mph) | 2023 | Operational |
Bandırma–Bursa–Osmaneli line | Bandırma–Bursa–Osmaneli | 201 km (125 mi) | Partly new | 200 km/h (120 mph) | 2025–2028 | Under upgradation |
Istanbul–Kapıkule railway | Halkalı–Kapıkule | 229 km (142 mi) | Partly new | 200 km/h (120 mph) | 2025–2028 | Under upgradation |
Mersin–Adana–Gaziantep railway | Mersin–Gaziantep | 311 km (193 mi) | Upgraded | 200 km/h (120 mph) | 2027 | Under upgradation |
Polatlı–İzmir | Polatlı–Alsancak | 505 km (314 mi) | New | 250 km/h (160 mph) | 2028 | Under construction |
Yerköy–Kayseri railway | Yerköy–Kayseri | 142 km (88 mi) | New | 250 km/h (160 mph) | 2028 | Under construction |
Kırıkkale–Çorum–Samsun | Kırıkkale Delice–Çorum | 120 km (75 mi) | New | 250 km/h (160 mph) | 2028 | Under construction |
Çorum–Samsun | 173 km (107 mi) | New | 250 km/h (160 mph) | TBD | Approved | |
Sivas-Zara line | Sivas-Zara | 74 km (46 mi) | New | 250 km/h (160 mph) | 2028 | Under construction |
Ankara–Istanbul second railway | Ankara–Istanbul | 344 km (214 mi) | New | 350 km/h (220 mph) | TBD | Approved |
Gaziantep–Şanlıurfa–Mardin line | Gaziantep–Şanlıurfa–Mardin | 316 km (196 mi) | Upgraded | 200 km/h (120 mph) | TBD | Approved |
Marmara line | Gebze–Yavuz Sultan Selim Bridge-Çatalca - North Marmara | 120 km (75 mi) | New | 250 km/h (160 mph) | TBD | Approved |
East line | Sivas– Çetinkaya-Malatya | 224 km (139 mi) | Partly new | 200 km/h (120 mph) | TBD | Approved |
Uzbekistan
[edit]Line | Termini | Length | Type | Maximum speed | Opening | Status |
---|---|---|---|---|---|---|
Tashkent–Bukhara | Tashkent–Bukhara | 600 km (370 mi) | New | 250 km/h (160 mph) | 2011 | Operational |
Bhukhara–Khiva | Bukhara-Khiva | 465 km (289 mi) | New | 250 km/h (160 mph) | 2030 | Under Construction |
Africa
[edit]Algeria
[edit]Line | Length | Type | Maximum speed | Opening | Status |
---|---|---|---|---|---|
Hassi Messaoud-Touggourt[49] | 153 km (95 mi) | new | 220 km/h (140 mph) | No data | Under construction |
Oued Tlélat–Tlemcen | 132 km (82 mi) | New | 220 km/h (140 mph) | TBD | Under construction |
Egypt
[edit]Line | Termini | Length | Type | Maximum speed | Opening | Status |
---|---|---|---|---|---|---|
Red line | Mersa Matruh–Ain Sokhna | 660 km (410 mi) | New | 230 km/h (140 mph) | 2027 | Under construction |
Yellow line | 6th Of October City–Abu Simbel | 1,100 km (680 mi) | New | 230 km/h (140 mph) | 2027 | Approved |
Purple line | Safaga–Luxor | 240 km (150 mi) | New | 230 km/h (140 mph) | 2027 | Approved |
Morocco
[edit]Line | Termini | Length | Type | Maximum speed | Opening | Status |
---|---|---|---|---|---|---|
Al Boraq | Tanger-Ville–Kenitra | 186 km (116 mi)[50] | New | 320 km/h (200 mph) | 2018 | Operational |
Europe
[edit]Austria
[edit]Line | Termini | Length | Type | Maximum speed | Opening | Status |
---|---|---|---|---|---|---|
Western Railway | Vienna–Salzburg | 243 km (151 mi)[51] | Upgraded | 230 km/h (140 mph) | 1990–2018 | Operational |
Salzburg–Köstendorf | 20 km (12 mi)[52] | New | 230 km/h (140 mph) | TBD | Approved | |
New Lower Inn Valley Railway | Kundl–Baumkirchen | 40.2 km (25.0 mi) | New | 220 km/h (140 mph) | 2012 | Operational |
Brannenburg-Kundl | 25 km (16 mi) | New | 250 km/h (160 mph) | TBD | Under construction | |
Wörgl Kundl–Knoten Schaftenau | 19 km (12 mi) | New | 250 km/h (160 mph) | TBD | Approved | |
Wels–German border | 50 km (31 mi)[53] | New | 250 km/h (160 mph) | 2040[54] | Approved | |
Koralm Railway | Graz–Klagenfurt | 127 km (79 mi) | New | 250 km/h (160 mph) | 2025 | Under construction |
Pottendorfer line | Vienna Inzersdorf Ort - Wr. Neustadt[55] | 47 km (29 mi) | Upgraded | 200 km/h (120 mph) | 2027 | Under upgradation |
Marchegger Eastern railway | Vienna Stadlau - Slovakian border | 38 km (24 mi) | Upgraded | 200 km/h (120 mph) | 2027 | Under upgradation |
North railway line | Gänserndorf - Břeclav (Czech Rep.) | 47 km (29 mi) | Upgraded | 200 km/h (120 mph) | 2030 | Under upgradation |
Semmering Base Tunnel | Gloggnitz–Mürzzuschlag | 27.3 km (17.0 mi) | New | 230 km/h (140 mph) | 2030 | Under construction |
Brenner Base Tunnel | Innsbruck–Italian border | 46 km (29 mi) | New | 250 km/h (160 mph) | 2032 | Under construction |
Baltic States (Estonia, Latvia and Lithuania)
[edit]Line | Termini | Length | Type | Maximum speed | Opening | Status |
---|---|---|---|---|---|---|
Rail Baltica | Tallinn–Vilnius | 870 km (540 mi) | New | 234 km/h (145 mph) | 2027 | Under construction |
Belgium
[edit]Line | Termini | Length | Type | Maximum speed | Opening | Status |
---|---|---|---|---|---|---|
HSL 1 | LGV Nord–Bruxelles-Sud | 88 km (55 mi) | New | 300 km/h (190 mph) | 1997 | Operational |
HSL 2 | Bruxelles-Nord–Liège-Guillemins | 66 km (41 mi) | New | 300 km/h (190 mph) | 2002 | Operational |
HSL 3 | Liège-Guillemins–Cologne-Aachen | 42 km (26 mi) | New | 260 km/h (160 mph) | 2009 | Operational |
HSL 4 | Antwerpen-Centraal–HSL Zuid | 36 km (22 mi) | New | 300 km/h (190 mph) | 2009 | Operational |
Czech Republic
[edit]Line | Termini | Length | Type | Maximum speed | Opening | Status |
---|---|---|---|---|---|---|
Line 001 | Prague-Poříčany | 30 km (19 mi) | Upgraded | 200 km/h (120 mph) | TBD | Under upgradation |
Přerov – Ostrava | 25.594 km (15.903 mi) | Upgraded | 200 km/h (120 mph) | TBD | Under upgradation | |
Line 002 | Brno-Vranovice | 83.796 km (52.068 mi) | Upgraded | 200 km/h (120 mph) | TBD | Under upgradation |
HSR1 | Praha – Brno – Ostrava | 407.1 km (253.0 mi) | New | 320 km/h (200 mph) | 2033-2045 | Approved |
HSR2 | Brno – Břeclav – Wien/Bratislava | 43.9 km (27.3 mi) | New | 320 km/h (200 mph) | 2033-2045 | Approved |
HSR3 | Praha – Plzeň – Mnichov | 107 km (66 mi) | Upgraded | 200 km/h (120 mph) | 2035 | Approved |
HSR4 | Praha – Ústí nad Labem – Dresden | TBD | New | 320 km/h (200 mph) | 2045 | Approved |
HSR5 | Praha – Hradec Králové – Vratislav | 110 km (68 mi) | New | 320 km/h (200 mph) | TBD | Approved |
Denmark
[edit]Line | Termini | Length | Type | Maximum speed | Opening | Status |
---|---|---|---|---|---|---|
Øresund Line | Copenhagen Central–Swedish border | 10 km (6.2 mi)[au] | New | 200 km/h (120 mph) | 2000 | Operational |
Copenhagen–Ringsted Line | Copenhagen central–Ringsted | 60 km (37 mi) | New | 200 km/h (120 mph) | 2019 | Operational |
Fehmarn Belt fixed link | Ringsted–Rødby | 8.3 km (5.2 mi)[au] | New | 200 km/h (120 mph) | 2028 | Under construction |
Vestfyn Line | Odense–Middelfart | 35 km (22 mi)[au] | New | 250 km/h (160 mph) | 2028 | Under construction |
Finland
[edit]
Line | Termini | Length | Type | Maximum speed | Opening | Status |
---|---|---|---|---|---|---|
Kerava–Lahti railway | Kerava–Lahti | 75.7 km (47.0 mi) | New | 220 km/h (140 mph) | 2006 | Operational |
Rantarata | Helsinki central–Turku Harbour | 63 km (39 mi)[56] | Upgraded | 200 km/h (120 mph) | 1995 | Operational |
Espoo—Salo | 95 km (59 mi) | New | 300 km/h (190 mph) | TBD | Approved | |
Helsinki–Riihimäki Railway | Helsinki central–Riihimäki | 71.4 km (44.4 mi) | Upgraded | 200 km/h (120 mph) | 1995 | Operational |
Riihimäki–Tampere railway | Riihimäki–Tampere | 116 km (72 mi) | Upgraded | 200 km/h (120 mph) | 1995 | Operational |
Tampere–Seinäjoki railway | Lielax–Seinäjoki | 156 km (97 mi) | Upgraded | 200 km/h (120 mph) | 2008[57] | Operational |
Oulu Main Line | Seinäjoki–Lapua | 23 km (14 mi) | Upgraded | 200 km/h (120 mph) | 2017 | Operational |
Lapua–Kokkola[58] | 110 km (68 mi) | Upgraded | 200 km/h (120 mph) | 2011 | Operational | |
Kokkola–Ylivieska | 79 km (49 mi) | Upgraded | 200 km/h (120 mph) | 2018 | Operational | |
Ylivieska–Liminka | 123 km (76 mi) | Upgraded | 200 km/h (120 mph) | 2015[59] | Operational | |
Savonia railway | Kinni-Otava | 45 km (28 mi)[60] | Upgraded | 200 km/h (120 mph) | 2006[61] | Operational |
Riihimäki–Saint Petersburg railway | Riihimäki–Russian border | 120 km (75 mi)[62] | Upgraded | 200 km/h (120 mph) | 2010[63]-2013[64] | Partly operational[65] |
Itärata | Kerava–Porvoo–Kouvola | 106 km (66 mi) | New | 300 km/h (190 mph) | TBD | Approved |
France
[edit]
Line | Termini | Length | Type | Maximum speed | Opening | Status |
---|---|---|---|---|---|---|
Orléans–Montauban railway | Orléans–Vierzon | 70.399 km (43.744 mi)[66] | Upgraded | 200 km/h (120 mph) | 1967[67] | Operational |
Paris–Bordeaux railway | Paris-Austerlitz–Bordeaux-Saint-Jean | 331.08 km (205.72 mi)[68] | Upgraded | 220 km/h (140 mph) | 1973 | Operational |
LGV Sud-Est | Paris Gare de Lyon, Paris–Gare de la Part-Dieu, Lyon | 409 km (254 mi) | New | 300 km/h (190 mph) | 1981[69]-1983[70] | Operational |
LGV Atlantique | Gare Montparnasse, Paris–Le Mans/Tours | 284 km (176 mi) | New | 300 km/h (190 mph) | 1989 | Operational |
Mantes-la-Jolie–Cherbourg railway | Mantes–Cherbourg | 85.267 km (52.982 mi)[71] | Upgraded | 200 km/h (120 mph) | 1989 | Operational |
Paris–Brest railway | Paris-Montparnasse–Brest | 47.8 km (29.7 mi)[72] | Upgraded | 220 km/h (140 mph)[73] | 1989[74] | Operational |
Strasbourg–Basel railway | Strasbourg–Basel[75] | 141.3 km (87.8 mi)[76] | Upgraded | 220 km/h (140 mph) | 1990 | Operational |
Le Mans–Angers railway | Le Mans–Angers-Saint-Laud | 73.8 km (45.9 mi)[77] | Upgraded | 220 km/h (140 mph) | Unknown | Operational |
Tours–Saint-Nazaire railway | Tours–Nantes | 80.6 km (50.1 mi)[78] | Upgraded | 220 km/h (140 mph) | Unknown | Operational |
Savenay–Landerneau railway | Savenay–Quimper | 42 km (26 mi)[79] | Upgraded | 220 km/h (140 mph) | Unknown[80] | Operational |
LGV Rhône-Alpes | Lyon-Saint-Exupéry–Valence | 115 km (71 mi) | New | 300 km/h (190 mph) | 1992 | Operational |
LGV Nord | Channel Tunnel–Gare du Nord, Paris | 333 km (207 mi) | New | 300 km/h (190 mph) | 1993 | Operational |
LGV Interconnexion Est | Aéroport Charles de Gaulle, Paris–Marne-la-Vallée–Chessy, Paris | 90 km (56 mi) | New | 270 km/h (170 mph)[81] | 1994 | Operational |
LGV Méditerranée | Avingnon–Marseille-Saint-Charles | 216 km (134 mi) | New | 320 km/h (200 mph) | 2001 | Operational |
LGV Est | Gare de l'Est, Paris–Lorraine, Louvigny | 406 km (252 mi) | New | 320 km/h (200 mph) | 2007[82]-2016[83] | Operational |
LGV Rhin-Rhône | Besançon Franche-Comté, Les Auxons–Belfort – Montbéliard, Paris | 140 km (87 mi) | New | 320 km/h (200 mph) | 2011 | Operational |
Belfort—Mulhouse | 50 km (31 mi) | New | 320 km (200 mi) | 2038 | Approved | |
Perpignan–Barcelona HSR | Montpellier Sud–Perthus Tunnel | 17.1 km (10.6 mi) | New | 300 km/h (190 mph) | 2013 | Operational |
LGV Sud Europe Atlantique | Poitiers–Bordeaux-Saint-Jean | 340 km (210 mi) | New | 320 km/h (200 mph) | 2017 | Operational |
LGV Bretagne-Pays de la Loire | Sablé-sur-Sarthe–Rennes | 214 km (133 mi) | New | 320 km/h (200 mph) | 2017 | Operational |
Contournement Nîmes – Montpellier | Nîmes-Pont-du-Gard–Montpellier Sud | 80 km (50 mi) | New | 220 km/h (140 mph) | 2018 | Operational |
Lyon–Turin HSR | Lyon-Saint-Exupéry–Mont d'Ambin Base Tunnel | 150 km (93 mi) | New | 220 km/h (140 mph) | 2032 | Under construction |
LGV Bordeaux–Toulouse | Bordeaux-Saint-Jean–Toulouse | 222 km (138 mi) | New | 320 km/h (200 mph) | 2032 | Under construction |
LGV Montpellier–Perpignan | Montpellier Sud–Perpignan | 150 km (93 mi) | New | 320 km/h (200 mph) | 2034[84]–2044[85] | Approved |
Germany
[edit]
Line | Termini | Length | Type | Maximum speed | Opening | Status |
---|---|---|---|---|---|---|
Berlin–Hamburg Railway | Berlin–Hamburg | 284.1 km (176.5 mi) | Upgraded | 230 km/h (140 mph) | 1931 | Operational |
Wanne-Eickel–Hamburg railway | Hamburg–Wanne-Eickel | 355 km (221 mi) | Upgraded | 200 km/h (120 mph) | 1978 | Operational |
Cologne–Duisburg railway | Cologne–Duisburg | 64 km (40 mi) | Upgraded | 200 km/h (120 mph) | 1980s | Operational |
Hamm–Minden railway | Hamm–Minden | 112 km (70 mi) | Upgraded | 200 km/h (120 mph) | 1980 | Operational |
Würzburg–Aschaffenburg railway | Würzburg–Aschaffenburg | 89.3 km (55.5 mi) | Upgraded | 200 km/h (120 mph) | 1982 | Operational |
Hanover–Minden railway | Hannover–Minden | 64.4 km (40.0 mi) | Upgraded | 200 km/h (120 mph) | 1984 | Operational |
Dortmund–Hamm railway | Dortmund–Hamm | 31 km (19 mi) | Upgraded | 200 km/h (120 mph) | 1986 | Operational |
Hanover–Hamburg railway | Hannover–Hamburg | 355.3 km (220.8 mi) | Upgraded | 200 km/h (120 mph) | 1987 | Operational |
Waghäusel Saalbach–Graben-Neudorf railway | NA (Connecting link) | 7.94 km (4.93 mi) | Upgraded | 200 km/h (120 mph) | 1988 | Operational |
Hanover–Würzburg | Hanover–Würzburg | 327 km (203 mi) | New | 250 km/h (160 mph)[av] | 1991 | Operational |
Mannheim–Stuttgart | Mannheim–Stuttgart | 99 km (62 mi) | New | 250 km/h (160 mph)[aw] | 1991 | Operational |
Rhine Railway | Mannheim–Rastatt | 99 km (62 mi) | Upgraded | 200 km/h (120 mph) | 1991 | Operational |
Frankfurt–Göttingen railway | Hanau–Hailer-Meerholz | 19 km (12 mi)[86] | Upgraded | 200 km/h (120 mph)[87] | 1993 | Operational |
Gelnhausen–Kalbach | 45.2 km (28.1 mi)[88] | Partly New | 250 km/h (160 mph) | 2030 [89] | Under construction | |
Fulda–Gerstungen | 41 km (25 mi)[90] | Partly New | 230 km/h (140 mph) | 2037 | Under construction | |
Hanover–Berlin | Hannover–Berlin | 258 km (160 mi) | New | 280 km/h (170 mph)[91] | 1998 | Operational |
Nuremberg–Würzburg railway | Nuremberg–Würzburg | 102.2 km (63.5 mi) | Upgraded | 200 km/h (120 mph) | 1999 | Operational |
Mannheim–Frankfurt railway | Mannheim–Frankfurt | 74.8 km (46.5 mi) | Upgraded | 200 km/h (120 mph) | 1999 | Operational |
Cologne–Frankfurt | Cologne–Frankfurt | 180 km (110 mi) | New | 300 km/h (190 mph) | 2002 | Operational |
Cologne–Aachen | Cologne–Aachen | 70 km (43 mi) | Upgraded | 250 km/h (160 mph) | 2002 | Operational |
Berlin–Halle railway | Berlin–Halle | 161.6 km (100.4 mi) | Upgraded | 200 km/h (120 mph) | 2006 | Operational |
Trebnitz–Leipzig railway | Bk–Leipzig | 81.2 km (50.5 mi) | Upgraded | 200 km/h (120 mph) | 2006 | Operational |
Nuremberg–Ingolstadt | Nuremberg–Ingolstadt | 77.5 km (48.2 mi) | New | 300 km/h (190 mph) | 2006–2013 | Operational |
Hamm–Warburg railway | Hamm–Warburg | 131 km (81 mi) | Upgraded | 200 km/h (120 mph) | 2007 | Operational |
Munich–Augsburg railway | Munich–Augsburg | 61.9 km (38.5 mi) | Upgraded | 230 km/h (140 mph) | 2011 | Operational |
Leipzig–Dresden railway | Leipzig–Riesa | 60 km (37 mi)[92] | Upgraded | 200 km/h (120 mph) | 2014 | Operational |
Dresden–Riesa | 54 km (34 mi)[93] | Upgraded | 200 km/h (120 mph) | 2030 [94] | Under upgradation | |
Erfurt–Leipzig/Halle | Erfurt–Leipzig/Halle | 123 km (76 mi) | New | 300 km/h (190 mph) | 2015 | Operational |
Nuremberg–Erfurt | Nuremberg–Erfurt | 107 km (66 mi) | New | 300 km/h (190 mph) | 2017 | Operational |
Wendlingen–Ulm | Wendlingen–Ulm | 59.5 km (37.0 mi) | New | 250 km/h (160 mph) | 2022 | Operational |
Ulm–Augsburg | Augsburg–Ulm | 70 km (43 mi) | New | 265 km/h (165 mph) | TBD | Under construction |
Stuttgart–Wendlingen | Stuttgart–Wendlingen | 25 km (16 mi) | New | 250 km/h (160 mph) | 2026 | Under construction |
Mannheim–Saarbrücken railway | St. Ingbert–Ludwigshafen | 82 km (51 mi) | Upgraded | 200 km/h (120 mph) | 2028 [95] | Under upgradation |
Lübeck–Puttgarden railway | Lübeck–Puttgarden | 88.6 km (55.1 mi) | Partly new | 200 km/h (120 mph) | 2030 [96] | Under upgradation |
Berlin–Dresden railway | Berlin Südkreuz–Dresden HBF | 174.2 km (108.2 mi) | Upgraded | 230 km/h (140 mph) | 2030 [97] | Under upgradation |
Karlsruhe–Basel | Karlsruhe–Basel | 182 km (113 mi) | New | 250 km/h (160 mph) | 2031 | Under construction |
Oberhausen–Arnhem railway | Oberhausen–Dutch border | 92 km (57 mi) | Upgraded | 200 km/h (120 mph) | TBD | Approved |
Preußen–Münster railway | Preußen–Münster | 45 km (28 mi) | Upgraded | 230 km/h (140 mph) | TBD | Approved |
Italy
[edit]
Line | Termini | Length | Type | Maximum speed | Opening | Status |
---|---|---|---|---|---|---|
Florence–Rome | Firenze Santa Maria Novella, Florence–Roma Termini | 254 km (158 mi) | New | 250 km/h (160 mph) | 1992 | Operational |
Turin–Milan | Torino Porta Susa, Turin–Milano Centrale | 148.3 km (92.1 mi) | New | 300 km/h (190 mph) | 2006 | Operational |
Milan–Venice railway | Padua–Venice | 25 km (16 mi)[98] | Upgraded | 220 km/h (140 mph) | 2007 | Operational |
Treviglio - Brescia | 39.6 km (24.6 mi)[99] | New | 250 km/h (160 mph) | 2016 | Operational | |
Brescia - Verona | 45.4 km (28.2 mi) | New | 250 km/h (160 mph) | 2026 | Under construction | |
Verona-Padua | 80 km (50 mi) | New | 250 km/h (160 mph) | 2029-2032 | Under construction | |
Milan–Bologna | Milano Centrale–Bologna Centrale | 214.6 km (133.3 mi) | New | 300 km/h (190 mph) | 2008 | Operational |
Naples–Salerno | Napoli Afragola–Salerno | 29 km (18 mi) | New | 250 km/h (160 mph) | 2008 | Operational |
Verona–Bologna railway | Verona–Bologna Centrale | 115 km (71 mi) | Upgraded | 200 km/h (120 mph) | 2009 | Operational |
Rome–Naples | Roma Termini–Napoli Centrale | 204.6 km (127.1 mi) | New | 300 km/h (190 mph) | 2009 | Operational |
Bologna–Ancona railway | Bologna–Ancona | 153 km (95 mi)[100] | Upgraded | 200 km/h (120 mph) | 2015 | Operational |
Adriatic railway | Brindisi–Lecce | 38.364 km (23.838 mi) | Upgraded | 200 km/h (120 mph) | 2018 | Operational |
Pescara–Termoli | 89.468 km (55.593 mi) | Upgraded | 200 km/h (120 mph) | 2026 | Under upgradation | |
Pisa–Rome railway | Cecina–Castagneto Carducci-Donoratico; Orbetello–Follonica | 91 km (57 mi) | Upgraded | 200 km/h (120 mph) | ? | Operational |
Milan–Verona | Milano Lambrate–Verona Porta Nuova | 165 km (103 mi) | New | 300 km/h (190 mph) | 2023 | Partly operational[ax] |
Tortona–Genoa | Genoa–Tortona | 53 km (33 mi) | New | 250 km/h (160 mph) | 2026 | Under construction |
Naples–Bari[101] | Naples–Bari | 147 km (91 mi) | New | 250 km/h (160 mph) | 2027 | Under construction |
Salerno–Reggio di Calabria railway | Battipaglia–Romagnano | 35 km (22 mi) | Partly new | 300 km/h (190 mph) | 2030 | Under construction |
Alessandria–Piacenza railway | Tortona–Voghera | 16 km (9.9 mi)[102] | Upgraded | 200 km/h (120 mph) | 2026 | Under upgradation |
Palermo–Catania–Messina high-speed railway | Palermo–Catania–Messina | 67 km (42 mi) | New | 250 km/h (160 mph) | 2029 | Under construction |
Genoa–Ventimiglia railway | Andora–Finale Ligure | 32 km (20 mi) | Upgraded | 200 km/h (120 mph) | 2030 | Under upgradation |
Brenner Base Tunnel+Verona-Brenner railway | Austrian border–Tunnel's south portal–Verona | 198 km (123 mi) | Partly new | 250 km/h (160 mph) | 2032 | Under construction |
Turin–Lyon high-speed railway | Turin–French border | 57 km (35 mi) | New | 220 km/h (140 mph) | 2032 | Under construction |
Venice–Trieste railway | Venice–Trieste | 153 km (95 mi) | Upgraded | 200 km/h (120 mph) | TBD | Under upgradation |
Ionian Railway | Taranto-Metaponto | 43.2 km (26.8 mi) | Upgraded | 200 km/h (120 mph) | TBD | Under upgradation |
Rome–Sulmona–Pescara railway | Rome–Pescara | 204 km (127 mi) | Upgraded | 200 km/h (120 mph) | TBD | Approved |
Netherlands
[edit]Line | Termini | Length | Type | Maximum speed | Opening | Status |
---|---|---|---|---|---|---|
HSL-Zuid | Amsterdam central–Belgian border | 125 km (78 mi) | New | 300 km/h (190 mph) | 2009 | Operational |
Lelystad–Zwolle railway | Lelystad Centrum–Zwolle | 50 km (31 mi) | Upgraded | 160 km/h (99 mph)[ay] | 2012 | Operational |
Norway
[edit]Line | Termini | Length | Type | Maximum speed | Opening | Status |
---|---|---|---|---|---|---|
Gardermoen Line | Oslo–Eidsvoll | 64 km (40 mi) | New | 210 km/h (130 mph) | 1998 | Operational |
Dovre Line | Langset-Kleverud | 17 km (11 mi) (of 484 km (301 mi)) | New | 200 km/h (120 mph) | 2015 | Operational |
Eidsvoll-Hamar(-Trondheim)[103] | 41 km (25 mi) (of 484 km (301 mi)) | Upgraded | 200 km/h (120 mph) | 2027 | Under upgradation | |
Hamar-Brumunddal-Lillehammer | 55 km (34 mi) | Partly new | 250 km/h (160 mph) | 2030[az]-2035[ba] | Under upgradation and construction | |
Vestfold Line | Farriseidet–Porsgrunn | 23.5 km (14.6 mi) | Upgraded | 200 km/h (120 mph) | 2018 | Operational |
Drammen–Kobbervikdalen | 9 km (5.6 mi) | Partly new | 200 km/h (120 mph) | 2025 | Under construction | |
Kobbervikdalen–Holm | 24.7 km (15.3 mi) | Partly new | 200 km/h (120 mph) | 2001–2002 | Operational | |
Nykirke – Holm | 14.1 km (8.8 mi) | New | 200 km/h (120 mph) | 2016 | Operational | |
Nykirke – Barkåker | 13.6 km (8.5 mi) | New | 250 km/h (160 mph) | 2026 | Under construction | |
Tønsberg – Barkåker | 7.7 km (4.8 mi) | New | 200 km/h (120 mph) | 2011 | Operational | |
Tønsberg–Larvik[104] | 40 km (25 mi) | New | 200 km/h (120 mph) | 2032 | Under construction | |
Follo Line | Oslo–Ski | 22 km (14 mi) | New | 200 km/h (120 mph) | 2022 | Operational |
Østfold Line | Ski–Fredrikstad | 50 km (31 mi)[105] | Partly new | 250 km/h (160 mph) | 2029 | Under upgradation and construction |
Poland
[edit]Line | Termini | Length | Type | Maximum speed | Opening | Status |
---|---|---|---|---|---|---|
Warsaw–Gdańsk railway | Warszawa Wschodnia–Gdańsk Główny | 150 km (93 mi)[106] | Upgraded | 200 km/h (120 mph) | 1977[107]–2014 | Operational |
Legionowo-Nosielsk (shortcut) | 33 km (21 mi) | New | 200 km/h (120 mph) | TBD | Under construction | |
Grodzisk Mazowiecki–Zawiercie railway | Grodzisk Mazowiecki–Zawiercie | 135.047 km (83.914 mi)[108] | Upgraded | 200 km/h (120 mph) | 2011 | Operational |
Warsaw-Białystok railway | Warszawa Wschodnia–Białystok | 224.1 km (139.2 mi) | Upgraded | 250 km/h (160 mph) | 2030[109] | Under upgradation |
Portugal
[edit]Line | Termini | Length | Type | Maximum speed | Opening | Status |
---|---|---|---|---|---|---|
Linha do Norte | Santa Apolónia, Lisbon–Campanhã, Porto | 116.2 km (72.2 mi)[110] | Upgraded | 220 km/h (140 mph) | 1999 | Operational |
Linha do Sul | Campolide, Lisbon–Tunes, Silves | 107 km (66 mi)[111] | Upgraded | 220 km/h (140 mph) | 2004 | Operational |
Linha de Évora | Casa Branca–Évora | 26.164 km (16.258 mi) | Upgraded | 200 km/h (120 mph) | 2010 | Operational |
Évora–Elvas–Spanish border | 100 km (62 mi) | New | 350 km/h (220 mph) | 2034 | Approved | |
Lisbon–Porto high-speed rail line | Lisbon-Santa Apolónia– Porto-Campanhã | 290 km (180 mi) | New | 300 km/h (190 mph) | 2030 | Under construction |
Russia
[edit]Line | Termini | Length | Type | Maximum speed | Opening | Status |
---|---|---|---|---|---|---|
Saint Petersburg–Moscow railway | Moscow Leningradsky–Moskovsky (Saint Petersburg) | 650 km (400 mi) | Upgraded | 250 km/h (160 mph) | 1984 | Operational |
Moscow–Saint Petersburg HSR | Moscow–Saint Petersburg | 679 km (422 mi) | New | 360 km/h (220 mph) | 2029 | Under construction |
Riihimäki–Saint Petersburg railway | Finnish border–St. Petersburg | 197 km (122 mi) | Upgraded | 200 km/h (120 mph) | 2013 | Service discontinued |
Serbia
[edit]Line | Termini | Length | Type | Maximum speed | Opening | Status |
---|---|---|---|---|---|---|
Budapest–Belgrade railway | Hungarian border–Belgrade | 150 km (93 mi) | Upgraded | 200 km/h (120 mph) | 2022 | Partly operational[bb] |
Spain
[edit]
Line | Termini | Length | Type | Maximum speed | Opening | Status |
---|---|---|---|---|---|---|
Madrid–Seville | Madrid Atocha–Seville–Santa Justa | 471.8 km (293.2 mi) | New | 300 km/h (190 mph) | 1992 | Operational |
Madrid–Levante | Madrid Atocha–Valencia-Joaquín Sorolla/Alicante | 603 km (375 mi) | New | 300 km/h (190 mph) | 1997–2010–2022 | Operational |
Madrid–Barcelona | Madrid Atocha–Barcelona Sants | 620.9 km (385.8 mi) | New | 300 km/h (190 mph)[112] | 2003–2008 | Operational |
Zaragoza-Huesca branch | Zaragoza–Huesca | 57 km (35 mi) | New | 200 km/h (120 mph) | 2005 | Operational |
Madrid–Toledo | Madrid Atocha–Toledo | 74 km (46 mi) | New | 300 km/h (190 mph) | 2005 | Operational |
Madrid–Málaga | Cordoba–Málaga María Zambrano | 154.5 km (96.0 mi) | New | 300 km/h (190 mph) | 2007 | Operational |
Madrid–Galicia | Madrid Chamartín–Santiago de Compostela | 415.7 km (258.3 mi) | New | 300 km/h (190 mph) | 2011–2021 | Operational |
Perpignan–Barcelona | Perpignan–Barcelona Sants | 175.5 km (109.1 mi)[113] | New | 300 km/h (190 mph) | 2013 | Operational |
Alcázar de San Juan–Cádiz railway | Seville–Santa Justa–Cádiz | 158.1 km (98.2 mi) | Upgraded | 220 km/h (140 mph) | 2015 | Operational |
Atlantic Axis | A Coruña–Vigo-Urzáiz | 155.6 km (96.7 mi) | New | 200 km/h (120 mph) | 2015 | Operational |
Madrid–Asturias | Madrid Chamartín–Lena, Asturias | 342.3 km (212.7 mi) | New | 300 km/h (190 mph) | 2015–2023 | Operational |
Valencia−Sant Vicenç de Calders railway | Estació del Nord, Valencia–Sant Vicenç de Calders, El Vendrell | 238 km (148 mi) | Upgraded | 220 km/h (140 mph) | 2018 | Operational |
Andalusian Corridor | Antequera-Santa Ana–Granada | 125.7 km (78.1 mi) | New | 300 km/h (190 mph) | 2019 | Operational |
Antequera-Santa Ana-Cadiz | 146 km (91 mi) | partly new | 300 km/h (190 mph) | 2030 | Under construction | |
Granada–Almería | 75 km (47 mi) | New | 300 km/h (190 mph) | 2030 | Under construction | |
Alcázar de San Juan–Jaén | Grañena–Jaén | 16.7 km (10.4 mi) | Partly new | 200 km/h (120 mph) | 2020 | Operational |
Alcázar de San Juan–Mora | 67.5 km (41.9 mi) | Partly new | 300 km/h (190 mph) | TBD | Under construction | |
Alcázar de San Juan–Linares | 187.6 km (116.6 mi) | Upgraded | 250 km/h (160 mph) | TBD | Approved | |
Madrid–Extremadura high-speed rail line | Badajoz–Plasencia | 192.6 km (119.7 mi) | Partly new | 200 km/h (120 mph) | 2022 | Operational |
Plasencia–Talayuela (Oropesa) | 68.6 km (42.6 mi) | Partly new | 250 km/h (160 mph) | 2025 | Under construction | |
Oropesa–Toledo | 127 km (79 mi) | Partly new | 200 km/h (120 mph) | 2030 | Under construction | |
LAV Venta de Baños-Burgos-Vitoria | Venta de Baños-Burgos | 86 km (53 mi) | New | 300 km/h (190 mph) | 2022 | Operational |
Burgos - Miranda de Ebro - Vitoria | 51.8 km (32.2 mi) | New | 300 km/h (190 mph) | 2028 | Under construction | |
LAV Palencia–Satander | Palencia–Alar del Rey | 78.4 km (48.7 mi) | New | 350 km/h (220 mph) | TBD | Under construction |
Alar del Rey–Reinosa | 44.4 km (27.6 mi) | New | 350 km/h (220 mph) | TBD | Under construction | |
Reinosa–Satander | 88 km (55 mi) | New | TBD | TBD | Approved | |
LAV León-Asturias | León-Asturias | 70.7 km (43.9 mi) | New | 250 km/h (160 mph) | 2023-2024 | Mostly operational[114] |
Murcia–Almería | Murcia del Carmen–Almería | 184 km (114 mi) | New | 300 km/h (190 mph) | 2026 | Under construction |
HSR Zaragoza – Pamplona | Castejon–Pamplona | 150 km (93 mi) | New | 300 km/h (190 mph) | 2027 | Under construction |
Zaragoza–Castejon | New | 300 km/h (190 mph) | 2033 | Under construction | ||
Basque Y | Bilbao–Vitoria-Gasteiz/San Sebastián | 172 km (107 mi) | New | 220 km/h (140 mph) | 2027 | Under construction |
Sweden
[edit]
Line | Termini | Length | Type | Maximum speed | Opening | Status |
---|---|---|---|---|---|---|
Southern Main Line | Malmö–Katrineholm | 330 km (210 mi)[115] | Upgraded | 200 km/h (120 mph) | 1990 | Operational |
Western Main Line | Stockholm central–Gothenburg central | 365 km (227 mi)[116] | Upgraded | 200 km/h (120 mph) | 1995 | Operational |
West Coast Line | Lund central–Gothenburg central | 233 km (145 mi)[117] | Upgraded, partly new | 200 km/h (120 mph) | 1985–2023 | Operational |
East Coast Line | Stockholm central–Sundsvall central | 250 km (160 mi)[118] | Upgraded, partly new | 200 km/h (120 mph) | 1996 | Operational |
Svealand Line | Södertälje South–Folkesta | 86 km (53 mi) | New | 200 km/h (120 mph) | 1997 | Operational |
Mälaren Line | Solhem-Västeras; Harksta–Kölback; Arborga–Hovsta | 155 km (96 mi) | Upgraded, partly new | 200 km/h (120 mph) | 2005 | Operational |
Bothnia Line | Höga Kusten Airport–Umeå | 190 km (120 mi) | New | 250 km/h (160 mph)[bc] | 2010 | Operational |
Norway/Vänern Line | Gothenburg central–Öxnered | 104 km (65 mi) | Upgraded, partly new | 200 km/h (120 mph) | 2012 | Operational |
Haparanda Line | Kalix–Haparanda | 43 km (27 mi) | Partly new | 250 km/h (160 mph)[bc] | 2012 | Operational |
North Bothnia Line | Umeå–Luleå | 270 km (170 mi) | New | 250 km/h (160 mph) | 2035 | Under construction |
The East Link | Järna–Linköping | 160 km (99 mi) | New | 250 km/h (160 mph) | 2035 | Under construction |
Götalandsbanan | Göteborg–Borås | 70 km (43 mi) | New | 250 km/h (160 mph) | TBD[119] | Under construction |
Linköping–Borås | 370 km (230 mi) | New | 250 km/h (160 mph) | TBD | Approved |
Switzerland
[edit]Line | Termini | Length | Type | Maximum speed | Opening | Status |
---|---|---|---|---|---|---|
Solothurn–Wanzwil railway | NA (Connecting line) | 12 km (7.5 mi) | New | 200 km/h (120 mph) | 2004 | Operational |
Mattstetten–Rothrist new line | Olten–Bern | 45 km (28 mi) | New | 200 km/h (120 mph) | 2007 | Operational |
Lötschberg Base Tunnel | NA (Connecting line) | 34 km (21 mi) | New | 250 km/h (160 mph)[bd] | 2007 | Operational |
Gotthard Base Tunnel | NA (Connecting line) | 57 km (35 mi) | New | 200 km/h (120 mph)[be] | 2016 | Operational |
Ceneri Base Tunnel | NA (Connecting line) | 15.4 km (9.6 mi) | New | 200 km/h (120 mph)[bf] | 2020 | Operational |
Simplon Railway | Vallorbe–Domodossola | 232.5 km (144.5 mi) | Upgraded | 200 km/h (120 mph) | 2030 | Under upgradation |
Turkey
[edit]- (See: Asia/Turkey section)
United Kingdom
[edit]
Line | Termini | Length | Type | Maximum speed | Opening | Status |
---|---|---|---|---|---|---|
Great Western Main Line | London Paddington–Bristol Temple Meads | 190.2 km (118.2 mi) | Upgraded | 201 km/h (125 mph) | 1970s | Operational |
South Wales Main Line | London Paddington–Pilning | 34.5 km (21.4 mi)[120] | Upgraded | 201 km/h (125 mph) | 1976 | Operational |
East Coast Main Line | London King's Cross–Edinburgh | 552.7 km (343.4 mi)[121] | Upgraded | 201 km/h (125 mph)[122] | 1978 | Operational |
Cross Country Route | York–Bristol Temple Meads | 56 km (35 mi) | Upgraded | 201 km/h (125 mph) | 2000s | Operational |
West Coast Main Line | Glasgow central–Euston, London | 442 km (275 mi)[123] | Upgraded | 201 km/h (125 mph) | 2005 | Operational |
High Speed 1 | Fawkham Junction–Channel Tunnel | 74 km (46 mi) | New | 300 km/h (190 mph) | 2003 | Operational |
St Pancras, London–Ebbsfleet | 39.4 km (24.5 mi) | New | 230 km/h (140 mph) | 2007 | Operational | |
Midland Main Line | St Pancras, London / Derby / Nottingham / Chesterfield | 100 km (62 mi)[124] | Upgraded | 201 km/h (125 mph) | 2009 | Operational |
High Speed 2 | Euston, London–Birmingham Curzon Street | 230 km (140 mi) | New | 360 km/h (220 mph) | 2033 | Under construction |
Crewe-Manchester | 153 km (95 mi) | New | 300 km/h (190 mph)[125] | 2040+ | Suspended, revived as a private initiative |
North America
[edit]United States
[edit]Line | Termini | Length | Type | Maximum speed | Opening | Status |
---|---|---|---|---|---|---|
Northeast Corridor | Boston South Station–Washington Union Station | 80.3 km (49.9 mi)[bg] | Upgraded | 240 km/h (150 mph) | 2000 | Operational |
Brightline | Orlando IAIT–Cocoa | 56.3 km (35.0 mi)[bh] | New[bi] | 201 km/h (125 mph)[bj] | 2023 | Operational |
California HSR | San Francisco–Los Angeles | 1,249 km (776 mi)[bk] | New | 350 km/h (220 mph) | 2030–2033[127] | Under construction |
Brightline West | Las Vegas–Los Angeles[bl] | 351 km (218 mi) | New | 320 km/h (200 mph) | 2028 | Under construction |
Victorville–Palmdale (connection between Brightline West and California HSR) | 87 km (54 mi) | New | TBD | 2033+ | Approved[bm] | |
Texas Central Railway | Houston–Dallas | 390 km (240 mi) | New | 330 km/h (210 mph) | 2030+ | Approved[bn] |
Pacific Northwest Corridor | Vancouver BC–Portland | 555.25 km (345.02 mi)[128] | New | 400 km/h (250 mph) | 2042–2047[129] | Approved |
See also
[edit]Notes
[edit]- ^ a b c Population data is based on worldometers.info, as of July 2024
- ^ Between 2011 and 2017 the top speed has been decreased from 350 to 310 km/h (220 to 190 mph) on all tracks and lines.[9][10]
- ^ Tōhoku Shinkansen to be increased to 360 km/h in around 2027; unconventional lines under construction are expected to be faster.
- ^ 1435+1067 dual gauge in the Seikan tunnel
- ^ Under construction lines
- ^ 250 km/h ready (ERTMS re-signaling needed). 205 km/h is permitted when 200 km/h trains are delayed.
- ^ Eurostar (international) trains only. 330 km/h after completion of (HS2). The East Coast Main Line will be increased from 200 to 225 km/h after re-signaling.
- ^ 750V DC Third-Rail at junctions only.
- ^ Sincan–Köseköy (313km) + Polatlı–Konya (212) + Kayaş–Sivas (394km) + Konya-Karaman (102km)
- ^ Under construction lines in Turkey.
- ^ Rolling stock is ready to be used on 1520 mm network abroad.
- ^ P.A.Th.E./P. sections supporting at least 200km/h are summed here.
- ^ Tashkent–Bukhara high-speed rail line
- ^ High-speed rail in Belgium
- ^ Diabolo project
- ^ High-speed rail in Poland
- ^ Western and New Lower Valley Inn Railway lines.
- ^ Linha do Norte (116.2 out of 336 km) + Linha do Sul (107 out of 274 km)
- ^ Additionally, the 10km extension from Elvas to the border.[21]
- ^ HSL Zuid (125 km) + Hanzelijn (50 km)
- ^ Eurostar (international) trains only, local high-speed trains (V250) failed to launch (250 km/h). 200 km/h trains started operation April 2023 (ICNG trains).
- ^ Gardermoen Line (64 km) + Vestfold Line (70 km out of 138 km) + Follo (22 km)+Dovre Line (17 km)
- ^ High-speed rail in Switzerland
- ^ 12.5 kV 60 Hz AC (New Haven–New York),
12 kV 25 Hz AC (New York–Washington),
25 kV 60 Hz AC (Boston–New Haven) - ^ Exception: 1530 in Uzbekistan.
- ^ Excluding Turkey which is counted in Asian section.
- ^ a b 25 kV 50 Hz AC (most common),
15 kV 16.7 Hz AC (second most common),
3 kV DC,
1.5 kV DC - ^ Exception: 1520 in Russia; 1524 in Finland; 1668 in Spain and Portugal
- ^ Exception: 1668 in Spain and Portugal
- ^ 12.5 kV 60 Hz AC (New Haven–New York),
12 kV 25 Hz AC (New York–Washington),
25 kV 60 Hz AC (Boston–New Haven) - ^ a b Part of the greater Beijing-Hong Kong, Macau corridor.
- ^ a b Part of the coastal corridor; consists of the Hangzhou-Fuzhou section which is already operational and is listed separately above
- ^ Tianjin-Yantai and Nantong-Suzhou sections under construction
- ^ Guangzhou-Hepu section is under construction
- ^ 812 km under construction
- ^ Including Yinchuan-Xi'an line and Hainan Eastern and Western ring railway lines.
- ^ 1,422 km is under construction; ~950 km is planned
- ^ 646 km is under construction
- ^ Porposed branch to Taipei crossing Taiwan Starit.
- ^ 690 km under planning; 409 km under construction
- ^ 2,965 km under construction
- ^ Including a branch line to Chongqinq.
- ^ Xiong'an-Xinzhou (340 km) and Chongqing-Kunming (698.98 km), totalling 1038.96 km is under construction
- ^ ~1,000 km under planning.
- ^ Max speed attained on record: 603 km/h
- ^ Demonstration since 2020.
- ^ a b c Danish side
- ^ 280 km/h if delayed.
- ^ 280 km/h if delayed; 300 km/h upgradable
- ^ 67 km of the section is operational while the rest of it is under construction.
- ^ Line is 200 km/h ready but as of 2024, there are no trainsets operating beyond 140-160 km/h on this route.
- ^ Hamar-Brumunddal
- ^ Brumunddal-Lillehammer
- ^ The 70km section of the line between Belgrade and Novi Sad is operational, with the rest of the section leading to Hungarian border under upgradation.
- ^ a b No trains operate above 200 km/h
- ^ For tilting trains; rest of the passenger trains operate at 200 km/h
- ^ 230 km/h in case of delay; 250 km/h designed speed
- ^ 230 km/h in case of delay; 250 km/h designed speed
- ^ While the Northeast Corridor spans 735 kms, only 80.3 km of its section support 240 km/h speeds. Several stretches of track on the Northeast Corridor can support up to 201 km/h speeds, but those speeds are the international standard definition of high-speed rail for upgraded tracks, and also are considered higher-speed rail by FRA standards.
- ^ While Brightline spans 273.5 km between Orlando and Miami, only a newly built section of 56.3 km between Orlando and Cocoa support speeds of up to 200 km/h, with rest of the section supporting 180 km/h.[126]
- ^ The 56.3 km stretch between Orlando and Cocoa which supports 200 km/h is newly built.
- ^ Though speeds up to 201 km/h are the international standard definition of high-speed rail on upgraded tracks, Brightline is more considered higher-speed rail by FRA standards.
- ^ The IOS (Initial Operating Segment) will be 171 miles, while the completed Phase 1 route will be 494 miles lomg. Currently, the completed system, which includes Phase 2 (includes Sacramento and San Diego), will be 776 miles long. Phase 2 has yet to begin construction.
- ^ The Brightline West will run to the Rancho Cucamonga station in Greater Los Angeles in Southern California, where riders can use the Metrolink San Bernardino Line to connect to Union Station.
- ^ To be under construction no earlier than California HSR reaches Palmdale and Brightline West reaches Victorville
- ^ EIS
References
[edit]- ^ "General definitions of highspeed". Paris, France: International Union of Railways (UIC). July 28, 2014. Archived from the original on July 20, 2011. Retrieved April 17, 2015.
- ^ C. S. Papacostas; Panos D. Prevedouros (2001). Transportation engineering and planning. Pearson College Division. ISBN 978-0-13-081419-7.
- ^ "High Speed lines in the world". Paris, France: International Union of Railways, UIC. July 23, 2010. Retrieved April 17, 2015.
- ^ "High speed lines in the World" (PDF). Paris, France: International Union of Railways, UIC. July 2021. Retrieved February 9, 2022.
- ^ "Le réseau des lignes de chemin de fer à grande vitesse en Europe" (PDF) (in French). Communauté d'intérêts pour les transports publics, section Vaud. May 2017. Retrieved June 5, 2018 – via citrap-vaud.ch.
- ^ "China's operating high-speed railway hits 45,000 km - People's Daily Online". en.people.cn. Retrieved January 11, 2024.
- ^ "China charges full speed ahead on bullet train expansion".
- ^ "China restores bullet train speed to 350 km/h – Xinhua | English.news.cn". www.xinhuanet.com. Archived from the original on January 30, 2018. Retrieved March 10, 2018.
- ^ "China begins to restore 350 kmh bullet train – Xinhua | English.news.cn". www.xinhuanet.com. Retrieved March 10, 2018.
- ^ "China Just Relaunched the World's Fastest Train". Fortune.com/. Retrieved September 1, 2017.
- ^ "Red de Alta Velocidad - Adif - AV - Adif". www.adifaltavelocidad.es. Retrieved February 4, 2025.
- ^ Lasserre, Benoît (January 7, 2017). "La vie à 320km/h: le conducteur de la première rame LGV raconte". Sud-Ouest (in French). ISSN 1760-6454. Retrieved July 17, 2022.
- ^ "Japan: JR bullet train network length by line 2023". Statista. Retrieved June 28, 2024.
- ^ "HS2 Phase One full business case". GOV.UK. Retrieved June 29, 2024.
- ^ "First high speed train Sapsan arrived in St Petersburg from Moscow :: Russia-InfoCentre". www.russia-ic.com. Retrieved June 30, 2024.
- ^ "Russia begins construction of first high-speed line". International Railway Journal. March 15, 2024. Archived from the original on March 15, 2024.
- ^ "Asian Infrastructure Investment Bank provides $108 million loan to Uzbekistan for railway line electrification". akipress.com. Retrieved June 30, 2024.
- ^ "Makkah to Medina in 90 minutes: Saudi king launches new Haramain rail service". Arabian Business. September 26, 2018.
- ^ "計畫介紹". www.hsr.gov.tw (in Chinese). Archived from the original on December 10, 2017. Retrieved January 12, 2018.
- ^ Pires, André (April 18, 2024). "Portugal: South International Corridor nears completion". Railway Gazette International. Retrieved June 30, 2024.
- ^ "Linha de Évora, Troço Elvas – (Caia) Fronteira | Infraestruturas de Portugal". www.infraestruturasdeportugal.pt. Retrieved June 30, 2024.
- ^ "More high speed sets in ONCF rolling stock order". Railway Gazette International. December 19, 2023. Retrieved June 30, 2024.
- ^ "Indonesia: 'Whoosh' train rockets beyond 1.3 million passengers". gulfnews.com. January 11, 2024. Retrieved June 30, 2024.
- ^ "Northeast Corridor Employee Timetable #5" (PDF). National Railroad Passenger Corporation (Amtrak). June 7, 2020. p. 110. Archived from the original (PDF) on June 7, 2020. Retrieved June 7, 2020 – via National Transportation Safety Board..
- ^ Radović, Z. (March 17, 2022). "Brza pruga Beograd - Novi Sad za građane se otvara u nedelju - koliko će vozova saobraćati i koje će biti cene karata". Euronews.rs (in Serbian). Retrieved June 30, 2024.
- ^ Vojvodine, Javna medijska ustanova JMU Radio-televizija. "Radovi na pruzi Novi Sad - Subotica, prvi brzi voz će proći krajem 2024". JMU Radio-televizija Vojvodine (in Serbian (Latin script)). Retrieved June 30, 2024.
- ^ CRNOMARKOVIĆ, A. "Nema stajanja! "Soko" će i do Niša ići 200 na sat: Kreću gradnja i obnova 1.165 kilometara pruga u Srbiji!". INFORMER (in Serbian). Retrieved June 30, 2024.
- ^ "Copenhagen-Ringsted High-Speed Line". Railway Technology. Retrieved June 30, 2024.
- ^ "Fjernbanen | Banedanmark". bane.dk. Retrieved June 30, 2024.
- ^ "Highways Department - Hong Kong Section of Guangzhou – Shenzhen – Hong Kong Express Rail Link". www.hyd.gov.hk. Retrieved June 30, 2024.
- ^ "Japanese high speed rail freight services expand". Railway Gazette International. June 4, 2024. Retrieved July 1, 2024.
- ^ "Sameday Rail". time:matters. Retrieved July 1, 2024.
- ^ "HighSpeedRail Freight in China: cargo-partner". www.cargo-partner.com. Retrieved July 1, 2024.
- ^ Barrow, Keith (June 29, 2015). "Last post for French high-speed freight as postal TGVs bow out". International Railway Journal. Retrieved July 23, 2015.
- ^ "Route alternative approved for the future construction of the Rail Baltica railway from Kaunas to the border with Poland | Rail Baltica". www.railbaltica.org. Retrieved July 1, 2024.
- ^ "Technical Parameters". www.railbaltica.org. Retrieved July 1, 2024.
- ^ "India's first high-speed project falls behind". International Railway Journal. Retrieved December 9, 2022.
- ^ Staff Writer; Finance, Arab. "Egypt, Siemens to ink contract for 2 lines of high-speed electric rail in May". www.zawya.com. Retrieved July 1, 2024.
- ^ https://www.railwaygazette.com/high-speed/abu-dhabi-dubai-high-speed-rail-construction-tenders-called/68243.article
- ^ "Tlemcen: Le LGV se rapproche de Maghnia à petite vitesse". ITA (in French). Retrieved July 1, 2024.
- ^ https://traveltomorrow.com/canada-invests-billions-in-toronto-quebec-city-high-speed-rail/
- ^ 1000 km of ALTO, 47 km of Cascadia
- ^ no earlier than 2027 for Cascadia, no earlier than 2030 for ALTO
- ^ no earlier than 2042 for Cascadia at complete length, no earlier than 2035 for ALTO at complete length, otherwise if routes will be completed by several phases, initial segment may be opened earlier
- ^ population projection by 2033 used from https://www.populationpyramid.net/fr/
- ^ last 3 km undecided
- ^ out of 331.3
- ^ Bangkok–Nakhon Ratchasima
- ^ "hassi messaoud - touggourt line".
- ^ "Morocco's Al Boraq Ranks 6th Fastest Train In the World". Amal El Attaq-Morocco World. Retrieved July 6, 2024.
- ^ out of 312.2 total
- ^ out of 312.2 total
- ^ Approximately
- ^ BMK (January 25, 2024). "Zielnetz 2040" (PDF) (in German). Retrieved January 28, 2024.
- ^ 30 km before Hungarian border
- ^ Karis – Paimio stretch, out of 195.8 km total
- ^ Kari Korpela, Juha-Pekka Häyrynen, Marcus Merin: Seinäjoki–Jyväskylä ja Haapamäki–Orivesi–Tampere-ratavyöhykkeiden joukkoliikenteen kehittämisohjelma. Ministerium für Transport und Kommunikation, Finnland, 2009, ISBN 978-952-243-007-6, ISSN 1795-4045, S. V (urn.fi).
- ^ Rataverkon kuvaus. Liikennevirasto, 2011, ISBN 978-952-255-696-7, ISSN 1798-8284, S. 16 (liikennevirasto.fi
- ^ [[1]] (Finnish)
- ^ out of 357.8 km total
- ^ Staatlicher Finanzbericht für das Jahr 2006. Buch I, Teil I. Edita Prima Oy, 2007, ISSN 1795-7559, S. 256 (eduskunta.fi (Seite nicht mehr abrufbar, festgestellt im November 2011. Suche in Webarchiven) – Originaltitel: Valtion tilinpäätöskertomus vuodelta 2006.)
- ^ out of 188 km total
- ^ Lahti-Luumäki
- ^ Luumäki-Vainikkala
- ^ final section (nearly one third of length) to Russian border checkpoint not in service after 2022
- ^ https://ressources.data.sncf.com/explore/dataset/vitesse-maximale-nominale-sur-ligne/table/?q=590000
- ^ Le Capitole service before 1990s, TGV since 1990s
- ^ 331.08 km of 200 km/h sections out of 534 km total route, Hubert Bonin (dir.) et Christophe Bouneau (dir.), Paris-Bordeaux en train : Les trois étapes de la modernité ferroviaire (1844-2016), Villeneuve d'Ascq, Presses universitaires du Septentrion, 2016, 214 p. (ISBN 978-2-7574-1283-1), p.141-147
- ^ south
- ^ north
- ^ out of 313 km total, [[2]]
- ^ out of 622 km total
- ^ after re-signaling[[3]]
- ^ TGV 1989-2017, Ouigo after 2017
- ^ triple border between France, Germany and Switzerland
- ^ as TER200 brand, then as TGV[[4]], planned service to Luxembourg [[5]]
- ^ out of 132 km total, [[6]]
- ^ out of 282.4 km total, La barre des 100 trains quotidiens est franchie sur Angers – Nantes, article de la revue Rail Passion, n°29 de mai 1999 page 32
- ^ out of 299.651 km total, Gérard Blier, Nouvelle Géographie ferroviaire de la France, Tome 2 : L'organisation régionale du trafic, 1993, éd. La Vie du Rail
- ^ no earlier than 1992 when electrified
- ^ [[7]]
- ^ first 300 km
- ^ rest 106 km
- ^ Montpellier to Béziers
- ^ Béziers to Perpignan
- ^ out of 240 km total
- ^ 230 km/h after 2025 planned
- ^ out of 240 km total
- ^ Bundesverkehrswegeplan 2030
- ^ out of 240 km total
- ^ most of the line - 250 km/h; 300 km/h upgradable
- ^ out of 116 km total
- ^ out 116.098 total
- ^ Bundesverkehrswegeplan 2030
- ^ Bundesverkehrswegeplan 2030
- ^ Bundesverkehrswegeplan 2030
- ^ Bundesverkehrswegeplan 2030
- ^ out of 267 km total
- ^ out of 267 km total
- ^ out of 204 km total
- ^ Hakimian, Rob (May 30, 2024). "Engineers using hyperbaric excavation technique for tunnel on Naples-Bari high-speed line". New Civil Engineer. Retrieved August 2, 2024.
- ^ out of 96 km total
- ^ excludung 17 km ready in 2015
- ^ https://www.banenor.no/prosjekter/
- ^ https://www.regjeringen.no/no/tema/transport-og-kommunikasjon/nasjonal-transportplan/id2475111/
- ^ out of 323.3 total [[8]]
- ^ constructed with geometrically allowed 250 km/h option already
- ^ out of 224 km total [[9]]
- ^ https://www.plk-sa.pl/files/public/user_upload/pdf/Akty_prawne_i_przepisy/Instrukcje/Wydruk/Id-12__D29__Wykaz_linii.pdf
- ^ out of 336 total[[10]]
- ^ out of 273.6 total[[11]]
- ^ 310 km/h previously; 330 km/h designed
- ^ including 24.6 km in France
- ^ final section suspended
- ^ out of 483
- ^ out of 455
- ^ out of 283
- ^ out of 402
- ^ no earlier than 2035; no later than 2040
- ^ out of 116.5 km total
- ^ out of 632.7 km total
- ^ 225 km/h in case of delay
- ^ out of 642 km total
- ^ out of 500 km total
- ^ 360 km/h by other sources
- ^ "Brightline High-Speed Rail Project, Florida". Railway Technology. Retrieved July 13, 2024.
- ^ not at full length, full network would take another 5-10 years
- ^ of which approx. 47 km in Canada
- ^ at full length; if construction starts in 2027; segments can be finished earlier not in full length