Shanghai Metro rolling stock
Part of a series on |
|
|
|
|
|
This article lists the rolling stock of the Shanghai Metro, a rapid transit system serving Shanghai. The table below contain the 1,190 trains with 7,394 carriages on the Shanghai Metro operational as of January 2021[update]. There are 49 types of stock in service as of June 2024.
Standard gauge is used throughout the network, allowing new train equipment to be transported over the Chinese rail network which uses the same gauge. In contrast to many other metro systems in the world, the Shanghai Metro uses overhead wires for the power supply, except for line 16, line 17 and Pujiang line which use third rail. All lines with overhead wires are DC1500V overhead wires. The overhead wires is divided into overhead catenary and overhead conductor rails. Except for the earlier construction of lines 1-4, all underground sections are powered by overhead conductor rails, and the rest are powered by overhead catenary.
Power supply
[edit]Shanghai Metro has set up 110kV main transformer station, subordinate AC33~35kV traction transformer station, AC10kV station transformer station (output three-phase four-line AC400V), and new line station uses AC35kV step-down substation (output three-phase four-line AC400V). The traction transformer station is a subordinate AC33kV to AC1250V transformer station, and an AC1250V rectifier station. After rectification, the voltage rises to DC1500V to DC1800V, and then it is transmitted to the overhead wires. The station uses AC220V for lighting and AC400V for large equipment. Shanghai Rail Transit usually uses an inter-area two-way power supply mode.
On line 2, Siemens Transportation Systems equipped the line with an overhead contact line (cantilever material: galvanized steel) and 7 DC traction power supply substations.[1]
Rolling stock
[edit]Initially, Siemens (global market share: 14%), Alstom (global market share: 18%) and Bombardier (global market share: 23%) directly sold the A-class trains to China, and then moved their production bases to China to produce and assemble the A-class trains by cooperating with large Chinese locomotive manufacturers. Shanghai Electric and Alstom set up a joint venture company, Shanghai Alstom Transportation Equipment Co., Ltd., Changchun Railway Passenger Vehicle Co., Ltd. and Bombardier set up a joint venture company, and Zhuzhou Electric Locomotive Co., Ltd. cooperated with Siemens.[2] On September 22, 2007 the first A-class train with independent intellectual property rights was produced at the production base of Rail Transit Equipment Company in Minhang.
Trains used in the Shanghai metro system | ||||||||
---|---|---|---|---|---|---|---|---|
Line | Class | Carriages | Number of trains | Number of carriages | Time of manufacture | Maximum speed | Automation | Notes |
1 | A | 8 | 73 | 584 | 1992-2019 | 80 km/h (50 mph) | GoA2 / STO | |
2 | A | 8 | 100 | 800 | 2000-2020 | 80 km/h (50 mph) | GoA2 / STO | |
3 | A | 6 | 49 | 294 | 2002-2017 | 80 km/h (50 mph) | GoA2 / STO | |
4 | A | 6 | 42 | 252 | 2004-2017 | 80 km/h (50 mph) | GoA2 / STO | |
5 | C | 4/6 | 50 | 200 | 2002-2019 | 80 km/h (50 mph) | GoA3 / DTO | |
4 | 17 | 68 | 2002-2004 | Operated on branchline. Only trains in which passengers cannot move between carriages. | ||||
6 | 33 | 132 | 2017-2019 | Operated on mainline. | ||||
6 | C | 4 | 76 | 304 | 2007-2020 | 80 km/h (50 mph) | GoA2 / STO | |
7 | A | 6 | 79 | 474 | 2008-2020 | 80 km/h (50 mph) | GoA2 / STO | |
8 | C | 6/7 | 90 | 602 | 2006-2020 | 80 km/h (50 mph) | GoA2 / STO | |
6 | 28 | 168 | 2006-2008 | |||||
7 | 62 | 434 | 2009-2020 | |||||
9 | A | 6 | 104 | 624 | 2004-2020 | 80 km/h (50 mph) | GoA2 / STO | |
10 | A | 6 | 67 | 402 | 2009-2019 | 80 km/h (50 mph) | GoA4 / UTO | On August 9, 2014 it was provided with GoA4 / UTO.[3] |
11 | A | 6 | 82 | 492 | 2008-2016 | 100 km/h (62 mph) | GoA2 / STO | |
12 | A | 6 | 75 | 450 | 2011-2020 | 80 km/h (50 mph) | GoA2 / STO | 12A03 trains have USB charging points. |
13 | A | 6 | 62 | 372 | 2011-2018 | 80 km/h (50 mph) | GoA2 / STO | |
14 | A | 8 | 49 | 392 | 2019-2020 | 80 km/h (50 mph) | GoA4 / UTO | |
15 | A | 6 | 54 | 324 | 2019-2020 | 80 km/h (50 mph) | GoA4 / UTO | All equipped with USB charging and wireless charging points. |
16 | A[i] | 6 | 38 | 228 | 2012-2020 | 120 km/h (75 mph) | GoA2 / STO | Some trains have USB charging points. Trains use tandem seats. |
17 | A | 6 | 38 | 228 | 2015-2024 | 100 km/h (62 mph) | GoA3 / DTO CASCO TRANAVI [ii] [iii] [iv] | |
18 | A | 6 | 50 | 300 | 2019-2020 | 80 km/h (50 mph) | GoA4 / UTO Alstom Urbalis 888 | In-carriage wireless and USB phone charging. |
Pujiang | L | 4 | 11 | 44 | 2016-2017 | 80 km/h (50 mph) | GoA4 / UTO Bombardier CITYFLO 650 | Cars with rubber tires running on concrete tracks. |
Total | 1,190 | 7,394 | ||||||
|
Signalling and telecommunication
[edit]In the beginning lines were built in an era where moving block CBTC systems were expensive and China had no experience with them. Therefore, lines 1-5 had fixed block CBTC systems capable of headways above 2.5 minutes. Lines 1, 3, 4, and 5 used ALSTOM URBALIS 200, line 2 uses Union Switch & Signal (now Ansaldo STS USA) AF900.[4] Lines 1, 2, and 5 have updated there system to equip with moving block CBTC. All Shanghai Metro lines -except lines 3 and 4 undergoing an upgrade between June 28, 2021 and 2025 - are equipped with moving block CBTC systems capable of headways as low as 90 seconds.[5]
Level of automation | Lines |
---|---|
GoA2 (Grade-of-Automation 2)[a] | 1 2 3 4 6 7 8 9 11 12 13 16 |
GoA3 (Grade-of-Automation 3)[b] | 2 [c] 5 17 |
GoA4 (Grade-of-Automation 4)[d] | 10 14 15 18 Pujiang |
Lines 1 and 2 use CASCO, lines 5 and 14 use Thales, Shanghai Electric TSTCBTC2.0, lines 6, 7, 8, 9, 11 use THALES SelTrac lines 10, 12, 13, 15, 16, 18 use ALSTOM Urbalis Line 17 uses CASCO TRANAVI and Pujiang line uses Bombardier CITYFLO 650.
Gallery
[edit]Current fleet
[edit]Trains used in the Shanghai metro system | |||||||||
---|---|---|---|---|---|---|---|---|---|
Fleet numbers | Manufacturer | Time of manufac- turing | Class | No of car | Assembly[i] | Rolling stock | Number | Line | Notes |
40 | ADtranz[ii] and Siemens CRRC Zhuzhou Locomotive Co., Ltd. (expansion cars and replacement cars) | 1993-1994 2008-2009 | A[iii] | 8 | Tc+Mp+M+Mp+M+Mp+M+Tc | 01A02 | 111-113, 115 and 116 (93371, 93421, 93431, 93481, 94011, 94061, 94131, 94181, 94191, 94241 and 014352-014643) | Line 1 | In 2008-2009 expanded DC01C trains by CRRC Zhuzhou Locomotive Trains are a combination of the Tc carriages of the original DC01 trains and the middle six carriages are newly produced by CRRC Zhuzhou Locomotive (30 newly produced carriages similar to 11A01). The trains are undergoing a major refurbishment in 2024 to keep them operational until 2037. Work is expected to be completed by November 2025. Trains will be removed and transported to CRRC Zhuzhou Locomotive for renovation and rebuilt. |
72 | 1998-2001 2011 | A[iii] | 8 | Tc+Mp+M+Mp+M+Mp+M+Tc | 01A03 | 117-125 (98011-98061, 99011-99481, 99502-99533, 00022-00053, 01742-01773, 01802-01833, 14672 and 14683) | Line 1 | 99251 wrecked at Tonghe Xincun station on March 24, 2004. It was repaired and returned to service. 98033 and 98042 wrecked at Shanghai Railway Station station on December 22, 2009. In 2011, these were replaced by two new carriages of CRRC Zhuzhou Locomotive.
Trainset 118-125 are an extension of the original AC01A trains by adding two newly produced by CRRC Zhuzhou Locomotive Tc carriages to six old middle AC01 carriages (using the 48 middle carriages from AC01). | |
96 | 1998-2001 2006-2008 | A[iii] | 8 | Tc+Mp+M+M+Mp+M+Mp+Tc | 01A04 | 126-137 (99491, 99541, 00011, 00061, 01251, 01301, 01361, 01371, 01421, 01431, 01481, 01491, 01541, 01551, 01601, 01611, 01661, 01671, 01721, 01731, 01781, 01791, 01841 and 013631-014342) | Line 1 | In 2008-2009 expanded AC01B trains by CRRC Zhuzhou Locomotive. Trains are a combination of the Tc carriages of the original AC01 and six CRRC Zhuzhou Locomotive carriages (42 newly produced carriages similar to 04A01). The Tc carriages of trainset 130-137 were returned from line 2 (AC02, trainset 217-224). | |
128 | Even numbers: SATCO[iv] (and 0155) Odd numbers CRRC Nanjing Puzhen Co., Ltd. (and 0140)[6] | 2006-2007 | A[iii] | 8 | Tc+Mp+M+Mp+M+M+Mp+Tc | 01A05 | 0140-0155 (012351-013621) | Line 1 | 013151 wrecked at Shanghai Railway Station station on December 22, 2009. It was repaired and returned to service. |
88 | CRRC Zhuzhou Locomotive Co., Ltd. | 2016-2018 | A[iii] | 8 | Tc+Mp+M+Mp+M+M+Mp+Tc | 01A06 | 0156-0166 (014681-015551) | Line 1 | |
160 | 2017-2019 | A[iii] | 8 | Tc+Mp+M+Mp+M+M+Mp+Tc | 01A07 | 01067-01086 (015561-017151) | Line 1 | ||
128 | ADtranz[ii] and Siemens | 2000-2001 | A[iii] | 8 | Tc+Mp+M+Mp+M+Mp+M+Tc | 02A01 | 201-216 (00071-00781, 01011-01241, 01262-01293, 01322-01353, 01382-01413, 01442-01473, 01502-01533, 01562-01593, 01622-01653 and 01682-01713) | Line 2 | Original name: AC02. In 2007, the six carriage 201-216 trainsets were expanded to eight carriage by using the middle carriages from 217-224. |
168 | Even numbers: SATCO[iv] (and 0253) Odd numbers: CRRC Nanjing Puzhen Co., Ltd. | 2007-2009 | A[iii] | 8 | Tc+Mp+M+Mp+M+M+Mp+Tc | 02A02 | 0233-0253 (021291-022961) | Line 2 | [7] Original name: AC08. |
128 | SATCO[iv] (0262-0269) CRRC Nanjing Puzhen Co., Ltd. (0254-0261) | 2009-2010 | A[iii] | 8 | Tc+Mp+M+Mp+M+Mp+Mp+Tc | 02A03 | 0254-0269 (022971-024241) | Line 2 | Original name: AC17a. Although the car has 4 pantographs, the sixth pantograph with carriage (Mp car) is generally not used. |
128 | SATCO[iv] CRRC Nanjing Puzhen Co., Ltd. | 2009-2010 2018-2020 (expansion cars) | A[iii] | 8 | Tc+Mp+M+Mp+M+Mp+Mp+Tc | 02A04 | 0270-0285 (024251-024881 and 024893-025522) | Line 2 | Formerly four car trainsets; 4 new carriages plugged in to form an eight car train. |
248 | CRRC Zhuzhou Locomotive Co., Ltd. | 2017-2020 | A[iii] | 8 | Tc+Mp+M+Mp+M+M+Mp+Tc | 02A05 | 02086-02116 (025531-027931) | Line 2 | |
168 | Alstom France (301,302) CRRC Nanjing Puzhen Co., Ltd. (303-328) | 2001-2004 | A | 6 | Tc+Mp+M+M+Mp+Tc | 03A01 | 301-328 (02011-02301, 03011-03961 and 04011-04421) | Line 3 | [8] Original name: AC03. 6 cars (03371-03421) have been refurbished at CRRC Nanjing Puzhen in January 2024. |
48 | SATCO[iv] (0333-0336) CNR Changchun Railway Vehicles Co., Ltd. (0329-0332) | 2014-2017 | A | 6 | Tc+Mp+M+M+Mp+Tc | 03A02 | 0329-0336 (031691-032161) | Line 3 | |
168 | Siemens (0401,0402) CRRC Zhuzhou Locomotive Co., Ltd. (0403–0428) | 2004-2007 | A | 6 | Tc+Mp+M+M+Mp+Tc | 04A01 | 0401-0428 (040011-041681) | Line 4 | [9] Original name: AC05. In February 2009, 8 trains used on line 2 (numbers: 0225-0232) returned to line 4. |
162 | SATCO[iv] (0430–0455) CNR Changchun Railway Vehicles Co., Ltd. (0429) | 2014-2017 | A | 6 | Tc+Mp+M+M+Mp+Tc | 04A02 | 0429-0455 (041691-043301) | Line 4 | 13 trains (042171-042941, trainset 0437-0449) have been assigned to line 3. |
68 | SATCO[iv] | 2002-2004 | C[v] | 4 | Tc+Mp+Mp+Tc | 05C01 | 501-513 and 515-518 (02011-02041, 03011-03401 and 04011-04241.) | Line 5 | Original name: AC11. Used on the branchline. Only sets without gangway connection between the carriages. |
198 | CNR Changchun Railway Vehicles Co., Ltd. | 2017-2019 | C[v] | 6 | Tc+Mp+M+M+Mp+Tc | 05C02 | 0519-0551 (050691-052661) | Line 5 | Used on the mainline. |
84 | SATCO[iv] | 2007-2009 | C[v] | 4 | Tc+Mp+Mp+Tc | 06C01 | 0601-0603 (060011-060121) 0605-0613 (060131-060481) 0615-0623 (060491-060841) | Line 6 | Original name: AC12. |
44 | CNR Changchun Railway Vehicles Co., Ltd. | 2009-2010 | C[v] | 4 | Tc+Mp+Mp+Tc | 06C02 | 0625-0633 (060851-061201) 0635-0636 (061211-061281) | Line 6 | [10] Original name: AC14A. |
72 | CNR Changchun Railway Vehicles Co., Ltd. | 2011-2012 | C[v] | 4 | Tc+Mp+Mp+Tc | 06C03 | 0637-0643 (061291-061601) 0645-0653 (061611-061921) 0655-0656 (061931-062001) | Line 6 | [10] Original name: AC14B. |
104 | CNR Changchun Railway Vehicles Co., Ltd. | 2018-2020 | C[v] | 4 | Tc+Mp+Mp+Tc | 06C04 | 06057-06082 (062011-063041) | Line 6 | |
252 | Bombardier | 2008–2010 | A[iii] | 6 | Tc+Mp+M+M+Mp+Tc | 07A01 | 0701-0742 (070011-072521) | Line 7 | Original name: AC10. Same as 09A02 and 12A01 (but different painting). |
180 | CNR Changchun Railway Vehicles Co., Ltd. | 2016-2018 | A[iii] | 6 | Tc+Mp+M+M+Mp+Tc | 07A02 | 0743-0772 (072531-074321) | Line 7 | Same as 09A03 (but different painting). |
42 | CNR Changchun Railway Vehicles Co., Ltd. | 2019-2020 | A[iii] | 6 | Tc+Mp+M+M+Mp+Tc | 07A03 | 07073-07079 (074331-074741) | Line 7 | |
168 | Alstom France (0801) SATCO[iv] (0802-0828) | 2006-2008 | C[v] | 6 | Tc+Mp+M+M+Mp+Tc | 08C01 | 0801-0828 (080011-081681) | Line 8 | 6 cars (080011-080061) built by CAF. Original name: AC07. |
126 | CNR Changchun Railway Vehicles Co., Ltd. | 2009-2010 | C[v] | 7 | Tc+Mp+M+M+M+Mp+Tc | 08C02 | 0829-0846 (081691-082941) | Line 8 | [11] Original name: AC15A. |
140 | CNR Changchun Railway Vehicles Co., Ltd. | 2010-2011 | C[v] | 7 | Tc+Mp+M+M+M+Mp+Tc | 08C03 | 0847-0866 (082951-083341) | Line 8 | [11] Original name: AC15B. |
168 | CNR Changchun Railway Vehicles Co., Ltd. | 2018-2020 | C[v] | 7 | Tc+Mp+M+M+M+Mp+Tc | 08C04 | 08067-08090 (083351-085301) | Line 8 | |
60 | Bombardier Movia 456 | 2004–2005 | A[iii] | 6 | Tc+Mp+M+M+Mp+Tc | 09A01 | 0901-0910 (090011-090601) | Line 9 | Seconded from line 1. Converted from AC04 in 2007; former number 011751-012341. |
246 | Bombardier Movia 456 | 2008–2010 | A[iii] | 6 | Tc+Mp+M+M+Mp+Tc | 09A02 | 0911-0951 (090611-093061) | Line 9 | 5 trains (numbers 0942–0945, 0948) used on the Expo line (trainset number 1301-1305) for the World Expo in 2010, returned to line 9 afterwards. Original name: AC09. Same as 07A01 and 12A01 (but different painting). |
216 | Bombardier Movia 456 | 2016–2018 | A[iii] | 6 | Tc+Mp+M+M+Mp+Tc | 09A03 | 0953-0988 (093131-095281) | Line 9 | Same as 07A02 (but different painting). |
102 | CNR Changchun Railway Vehicles Co., Ltd. | 2018–2020 | A[iii] | 6 | Tc+Mp+M+M+Mp+Tc | 09A04 | 09089-09105 (095291-096301) | Line 9 | |
246 | Odd numbers: SATCO[iv] Even numbers: Nanjing Puzhen Rolling Stock Co., Ltd. | 2009-2010 | A | 6 | Tc+Mp+M+M+Mp+Tc | 10A01 | 1001-1041 (100011-102461) | Line 10 | [12] Between 26 December 2020 and the spring of 2022 the operator cabs have the wall of driver cab removed. Original name: AC13. 100251 and 100961 wrecked on September 27, 2011. They were repaired and returned to service. |
104 | 2017-2019 | A | 6 | Tc+Mp+M+M+Mp+Tc | 10A02 | 10042-10067 (102471-104021) | Line 10 | [13] | |
396 | CRRC Zhuzhou Locomotive Co., Ltd. | 2008-2011 | A[iii] | 6 | Tc+Mp+M+M+Mp+Tc | 11A01 | 1101-1166 (110011-113961) | Line 11 | [14] Some of the trains are Disney-themed trains, and the inside and outside of the trains are packaged with Disney cartoon elements. Original name: AC16. |
36 | CNR Changchun Railway Vehicles Co., Ltd. | 2015-2016 | A[iii] | 6 | Tc+Mp+M+M+Mp+Tc | 11A02 | 1167-1172 (113971-114321) | Line 11 | |
60 | CRRC Zhuzhou Locomotive Co., Ltd. | 2015-2016 | A[iii] | 6 | Tc+Mp+M+M+Mp+Tc | 11A03 | 1173-1182 (114331-114921) | Line 11 | |
246 | Bombardier Movia 456 | 2011-2013 | A[iii] | 6 | Tc+Mp+M+M+Mp+Tc | 12A01 | 1201-1241 (120011-122461) | Line 12 | Original name: AC09B. Same as 07A01 and 09A02 (but different painting). |
90 | Bombardier Movia 456 | 2017-2018 | A[iii] | 6 | Tc+Mp+M+M+Mp+Tc | 12A02 | 1242-1256 (122471-123361) | Line 12 | |
114 | CNR Changchun Railway Vehicles Co., Ltd. | 2018-2020 | A[iii] | 6 | Tc+Mp+M+M+Mp+Tc | 12A03 | 12057-12075 (123371-124501) | Line 12 | USB charging ports (concealed design). |
144 | CRRC Nanjing Puzhen Co., Ltd. | 2011-2014 | A[iii] | 6 | Tc+Mp+M+M+Mp+Tc | 13A01 | 1301-1324 (130011-131441) | Line 13 | Original name: AC18. |
228 | CRRC Nanjing Puzhen Co., Ltd. | 2016-2018 | A[iii] | 6 | Tc+Mp+M+M+Mp+Tc | 13A02 | 1325-1362 (131451-133721) | Line 13 | [15] |
392 | CRRC Nanjing Puzhen Co., Ltd. | 2019–2020 | A[iii] | 8 | Tc+Mp+M+Mp+M+M+Mp+Tc | 14A01 | 14001-14049 (140011-143921) | Line 14 | [16] |
324 | SATCO[iv] and CRRC Changchun Railway Vehicles | 2019-2020 | A[iii] | 6 | Tc+MP+M+M+MP+Tc | 15A01 | 15001-15054 (150011-153241) | Line 15 | Front of the train adopts an open driver's cab. |
138 | Siemens and CRRC Zhuzhou Locomotive Co., Ltd. | 2012-2014 | A[vi] | 3 | Mcp+M+Mcp=Mcp+M+Mcp | 16A01 | 1601-1646 (160011-161381) | Line 16 | Original name: AC19. Formerly three carriage trains;[17] two trains have been coupled (may decouple in trough hours) to form a six carriage train.[18][19] Horizontal rows and reversible seats. |
90 | CRRC Zhuzhou Locomotive Co., Ltd. | 2018-2020 | A[vi] | 6 | Tc+Mp+M+M+Mp+Tc | 16A02 | 16047-16061 (161391-162281) | Line 16 | USB charging port. Carriages 1, 2, 5, and 6 use tandem seats, while carriages 3 and 4 use horizontal seats.[vii] |
168 | CNR Changchun Railway Vehicles Co., Ltd. (1701-1705) SATCO[iv] (1706-1728) | 2015-2017 | A[iii] | 6 | Tc+M+M+M+M+Tc | 17A01 | 1701-1728 (170011-171681) | Line 17 | |
60 | CNR Changchun Railway Vehicles Co., Ltd. and SATCO[iv] | 2023-2024 | A[iii] | 6 | Tc+M+M+M+M+Tc | 17A02 | 17029-17038 (171691-172281) | ||
300 | CRRC Zhuzhou Locomotive Co., Ltd. | 2019-2020 | A[iii] | 6 | Tc+Mp+M+M+Mp+Tc | 18A01 | 18001-18050 (180011-183001) | Line 18 | Front of the train adopts an open driver's cab. In-carriage wireless and USB phone charging. |
Refurbishment and improvements
[edit]Currently, three types of stock will be refurbished or modernized:
- 01A02 - The old carriages have been renovated during the 2008-2009 expansion, which included replacing train doors with electric doors from pneumatic doors, changing the lampshades of the internal lights from grids to white plastic shells, and adding new electronic destination displays.
As the older carriages are about to reached the end of their life, another refurbishment will be carried out. Renovation includes structural repairs, extend their lifespans for an additional 14 years. - 02A01 - Most of carriages will be took out of service in 2024 to upgrade signalling systems and replace pneumatic doors to electric doors. Cars 00071-00121, 01262 and 01273 were the first to be modernized and backed to service.
- 03A01 - The trains will have a major renovation. This includes redesigning a different style livery of red, yellow and white on bodies and trains' front. The trains will also receive a new passenger information systems, including LCD signs displaying train destination, the next station, route map, and the time. The signalling system will be upgraded. Traction systems will be changed from ONIX 1500 to OptONIX STD 1500. The lifespan of trains will be extended from 30 years to at least 45 years. 03371-03421 have been refurbished in January 2024.
Former fleet
[edit]Trains formally used in the Shanghai metro system | |||||||||
---|---|---|---|---|---|---|---|---|---|
Fleet numbers | Manufacturer | Time of manufac- turing | Class | No of car | Assembly | Rolling stock | Number | Line | Notes |
88 | ADtranz[ii] and Siemens CRRC Zhuzhou Locomotive Co., Ltd. (expansion cars and replacement cars) | 1992-1994 2007-2008 | A[iii] | 8 | Tc+Mp+M+Mp+M+Mp+M+Tc | 01A01 | 101-110 and 114 (92011-92241, 93011-93361, 93382-93413, 94022-94053, 94071-94121, 94142-94173, 94202-94233, 14652 and 14663) | Line 1 | In 2008-2009 expanded DC01B trains by CRRC Zhuzhou Locomotive using the middle carriages of trainset 111-113, 115, and 116.
|
6 | Shanghai Electric | 2007 | A | 6 | Tc+Mp+M+M+Mp+Tc | 09ASY | 0952 (093071-093121) | Line 9 | On 20 December 2011, it was reassigned to be a special training vehicle. |
| |||||||||
Surplus cars and retired cars
[edit]The surplus cars are older 92113, older 98033 and older 98042. Older 92113 being damaged in a test run in Tonghe Xincun station in 2004. 98033 and 98042 were severely damaged in 2009 Shanghai Railway Station station crash.Three new cars built by CRRC Zhuzhou Locomotive replaced them in 2007 and 2011. 98042 was converted to the SMTC Experimental Car in 2014. All of useful parts on 92113 and 98033 have been cannibalised for other carriages, so they are no longer be used.
Cars not in service
[edit]09ASY - This stock was built for experimental purposes. These cars (093071-093121, trainset 0952) no longer in service since 2010 and converted into a training train in 2011. Stored at Longyang Road Depot.
Depots and yards
[edit]Shanghai Metro system has 13 depots and 15 yards.
- 1 Meilong Depot (Chinese: 梅陇车辆段): Located near Jinjiang Amusement Park, Minhang District, Xuhui District, on the south side of the segment between Shanghai South Railway Station and Jinjiang Park, it is the first depot constructed in Shanghai; used for the parking and maintenance. Also undertakes advanced maintenance and overhaul of other trains in Shanghai Metro. There is a connection line with Shanghai-Kunming Railway.
- 1 Fujin Road Yard (Chinese: 富锦路停车场): Located on the west side of Yunchuan Road, Fujin Road, Baoshan District, and northwest of terminal station Fujin Road used for parking and maintenance. It was officially completed on December 18, 2007. The yard can park 54 8-carriage metro trains at the same time, covering an area of about 30 hectares (at the time the largest metro yard in Asia).[22]
- 2 7 Longyang Road Depot (Chinese: 龙阳路車輛段): Located in the southeast of Longyang Road, Luoshan Road; northeast of Longyang Road, southeast of Huamu Road. It is used for parking and maintenance. There is a connection line between lines 2 and 7.
- 2 Chuansha Yard (Chinese: 川沙停车场): Located between Chuansha Dongheng Port and Shajiao River, northeast of Yuandong Avenue, covering an area of about 12.6 hectares; used for parking and maintenance of line 2 trains.
- 2 13 Beidi Road Depot (Chinese: 北翟路车辆段): Located on the north side of Hongqiao transportation hub near Jingli West Road, north of Beidi Road, west of S20, south of Wusong River and east of Xupu Port; to the northwest of Songhong Road and the southeast of West Jinshajiang Road. It was put in operations in 2009 and currently used for the parking and maintenance of line 2 and line 13 trains. There is a connection line between lines 2 and 13.
- 3 Shilong Road Yard (Chinese: 石龙路停车场): Located on the east side of Longwu Road, Shilong Road, Xuhui District; on the south side of the segment between Shanghai South Railway Station and Shilong Road. It is currently used for the parking and maintenance of line 3 trains and has a connection line with the Shanghai-Kunming Railway.
- 3 North Jiangyang Road Depot (Chinese: 江杨北路车辆段) (sometimes referred as Baogang Depot): Located on the east side of Fujin Road, North Jiangyang Road, Baoshan District, and southeast of terminal station North Jiangyang Road; used for parking and maintenance of line 3 trains. Also undertakes advanced maintenance work for line 4 trains.
- 4 Puhuitang Parking Lot (Chinese: 蒲汇塘停车场): Located on the east side of Guilin Road, Wuzhong Road, Xuhui District; on the west side of Shanghai Indoor Stadium, southwest of Yishan Road Station; used for parking and maintenance of line 4 trains.
- 5 Pingzhuang Highway Depot: Located on the southwest side of Jinhai Road intersection of Pingzhuang Highway, Fengxian District; south of the terminal station Fengxian Xincheng. It is used for parking and maintenance.
- 5 Jianchuan Road Depot (Chinese: 剑川路车辆段): Located on the west side of Jianchuan Road, Humin Road, northwest of northeast of Jianchuan Road; used for parking and maintenance of line 5 trains, and has a connection line with Wujing branch line, a freight branch of the Shanghai-Kunming line.
- 5 Xinzhuang Yard (Chinese: 莘庄停车场): Located in the east of Xinzhuang and has a connection line with line 1.
- 6 10 Gangcheng Road Depot (Chinese: 港城路车辆段): Located on the northwest side of Gangcheng Road; used for parking and maintenance of line 6 and 10 trains. There is a connection line between lines 6 and 10.
- 6 Sanlin Yard (Chinese: 三林停车场): Located in the northeast of West Huaxia Road and southeast of Gaoqing Road; used for parking and maintenance of line 6 trains. It was originally scheduled to be used for the parking and maintenance of line 11 trains, but this was cancelled due to the adjustment of the north-south dividing point of line 11 (now Chuanyanghe Yard is in use of line 11).
- 7 15 Jinqiu Road Yard (Chinese: 锦秋路停车场): Located west of Qihua Road on Jinqiu Road to the south of Hizaobang and east of the outer ring line; used for parking and maintenance for line 7 and 15 trains. Chentai Road parking lot and Xincun Road control center are shared with other lines of Shanghai Metro. There is a connection line between line 7 and 15.
- 8 Yinhang Depot (Chinese: 殷行车辆段): Located on the north side of terminal station Shiguang Road, Yinhang City; used for parking and maintenance of line 8 trains. It has a connection line with the railway Nanhe branch line.
- 8 Pujiang Pujiang Town Yard (Chinese: 浦江镇停车场): Located on the east side of Shanghai Puxing Highway, the north side of Shenjiahu Highway, the west side of Sanlu Highway, and southeast Shendu Highway (south of Pujiang line); used for parking and maintenance of line 8 and Pujiang trains.
- 9 Jiuting Depot (Chinese: 九亭车辆段): Located on the north side of Zhongchun Road, Husong Road, northeast of Zhongchun Road and there is an inbound and outbound line between Zhongchun Road and Jiuting; used for the parking and maintenance of line 9 trains. Although it is close to Shanghai-Hangzhou Railway, there is no connection line and new trains need to be transported into the depot using a flatbed truck.
- 9 12 14 Jinqiao Yard (Chinese: 金桥停车场): Located on the south side of Jinhai Road and on the east side of Jinsui Road, on the south side of Jinji Road. There is an inbound and outbound line at Jinji Road. It is used for parking and maintenance of line 9, 12 and 14 trains. There is a connection line between lines 9, 12, and 14.
- 10 Wuzhong Road Yard (Chinese: 吴中路停车场): Located near the outer ring line of Wuzhong Road,south of Ziteng Road. Covering an area of about 23.4 hectares. Used for parking and maintenance of line 10 trains. The parking lot has been built as an open-top project "Shanghai New Speed Metro Dynamic Museum", which is the current Shanghai Metro Museum.
- 11 Chengbei Road Yard (Chinese: 城北路停车场): Located in the middle of Chengbei Road, Shengzhu Road, Pingcheng Road and Jiatang Road, across Chenjiashan Road, northeast of North Jiading. Used for parking and maintenance of line 11 trains.
- 11 13 16 Chuanyanghe Yard (Chinese: 川杨河停车场): Located northeast of Luoshan Road, southeast of Middle Huaxia Road and south of the Maglev . Used for parking and maintenance of line 11, 13 and 16 trains. There is a connection line between lines 11, 13 and 16.
- 11 Shanghai Circuit Depot (Chinese: 赛车场车辆段): Located on the opposite side of Shanghai Circuit, at the northwest corner of the Shanghai Circuit. It covers an area of about 26.67 hectares and is used for the parking and maintenance of line 11 trains.
- 12 Zhongchun Road Yard (Chinese: 中春路停车场): Located on the northwest side of the intersection of Gudai Road and the Shanghai-Hangzhou Railway and on the west side of terminal station Qixin Road, covering an area of 13.35 hectares. It is the parking lot for line 12 trains. There is a connection line with the Shanghai-Hangzhou Railway.
- 14 Fengbang Depot (Chinese: 封浜车辆段): Located in the area west of Fengbang River, south of Cao'an Road, west of railway line, and north of G2 expressway.
- 15 Yuanjiang Road Depot: Located to the west of Lianhua South Road and north of Zhuanxing East Road.
- 16 Yebei Depot (Chinese: 治北车辆段): Located to the southeast of East Huinan. Used for the parking and maintenance of line 16 trains. It is planned to also be used for the parking and maintenance of line 2 trains. There is a track with both the catenary and third rail at the entrance and exit of the depot for trains to switch over as line 16 uses third rail for power supply on the main line and catenary for power supply in the depot. Also the test line in the depot is also equipped with a catenary and a third rail.
- 17 Xujing Depot (Chinese: 徐泾车辆段): Located on the south side of Songze Avenue and on the east side of Xule Road;
- 17 Zhujiajiao Yard (Chinese: 朱家角停车场): Located on the south of Huqingping Highway and Huqingping Expressway North side.
- 18 Hetao Road Depot (Chinese: 航头定修段): Located on the west side of Hetao Road.
Notes
[edit]- ^ In a Grade-of-Automation 2 (GoA2) system, trains run automatically from station to station but a driver is in the cab, with responsibility for door closing, obstacle detection on the track in front of the train and handling of emergency situations. As in a GoA3 system, the GoA2 train cannot operate safely without the staff member on board.
- ^ In a Grade-of-Automation 3 (GoA3) system, trains run automatically from station to station but a staff member is always in the train, with responsibility for handling of emergency situations. In a GoA3 system, the train cannot operate safely without the staff member on board.
- ^ Under testing.
- ^ In a Grade-of-Automation 4 (GoA4) system, trains are capable of operating automatically at all times, including door closing, obstacle detection and emergency situations. On-board staff may be provided for other purposes, e.g. customer service, but are not required for safe operation. Controls are often provided to drive the train manually in the event of a computer failure.
References
[edit]- ^ "Metro-System Line 2, Shanghai, China". Archived from the original on 2009-06-28. Retrieved 2008-07-06.
- ^ Hengli, Wang (September 21, 2007). "国产A型地铁列车明在沪下线 2010年投运(图)". Sina.
- ^ "Explore the first FAO metro line in China. Shanghai Metro Line 10". Casco.
- ^ Connolly, Helen (31 July 2003). "URBALIS for Shanghai metro". Alstom Press Release.
- ^ 沪部分轨交线明年采用信号系统升级版 (in Chinese). Archived from the original on 2015-06-02. Retrieved 2012-11-22.
- ^ 上海地铁一号线延伸线列车. 中车南京浦镇车辆有限公司 (in Chinese). Retrieved 2020-03-20.
- ^ 上海地铁二号线西延线列车. 中车南京浦镇车辆有限公司 (in Chinese). Retrieved 2020-03-20.
- ^ 上海明珠线地铁列车. 中车南京浦镇车辆有限公司 (in Chinese). Retrieved 2020-03-20.
- ^ 上海市明珠二期轨道交通车辆 (in Chinese). 2013-11-24. Retrieved 2020-03-20.
- ^ a b 上海地铁6号线车辆. 中车长春轨道客车有限公司 (in Chinese). Retrieved 2020-03-20.
- ^ a b 上海地铁8号线车辆. 中车长春轨道客车股份有限公司 (in Chinese). Retrieved 2020-03-20.
- ^ 上海十号线地铁列车. 中车南京浦镇车辆有限公司 (in Chinese). Archived from the original on 2020-03-20. Retrieved 2020-03-20.
- ^ "轨交10号线将增26列新车 仍为6节编组A型车_大申网_腾讯网". sh.qq.com. Archived from the original on 2021-06-06. Retrieved 2021-06-06.
- ^ 上海市轨道交通十一号线北段车辆. 中车株洲电力机车有限公司 (in Chinese). 2013-11-24. Retrieved 2020-03-20.
- ^ 上海地铁十三号线列车. 中车南京浦镇车辆有限公司 (in Chinese). Retrieved 2020-03-20.
- ^ "First of 49 Bombardier MITRAC propulsion-equipped metro trains for Shanghai Metro's Line 14 rolled off the assembly line". Bombardier. Retrieved 2020-03-20.
- ^ 上海市轨道交通十六号线车辆. 中车株洲电力机车有限公司 (in Chinese). 2017-01-06. Retrieved 2020-03-20.
- ^ 16号线首列新车进入动态调试. 上海市浦东新区人民政府 (in Chinese). 2020-02-27. Retrieved 2020-03-20.
- ^ 钟, 晖 (2020-02-26). 昨晚16号线新车正式进入动车调试阶段,预计3月底首列新车完成调试!. 周到上海-新闻晨报官方网站 (in Chinese). Retrieved 2020-03-20.
- ^ Chen Huizhi (2019-11-25). "Longer trains for Metro Line 16". Shine.cn.
- ^ City's 6,000th Metro train ready for service. Shine.cn. 2020-05-28.
- ^ Ren, Long (December 18, 2007). "上海:亚洲最大地铁列车停车场建成 [Shanghai: Asia's largest metro train yard completed]". Central government. Xinhua News.